Similar Projects
Tuttle Apartments
New Construction
Conception
$86,000,000 est. value
Davenport, FL 33837

Woodland Creek Apartments
New Construction
Conception
Kissimmee, FL 34744

Fifth Avenue Estates
New Construction
Design
Homestead, FL 33034

The Vue at Clermont
New Construction
Design
Clermont, FL

Catalytic Opportunity Sites - 2021
New Construction
Bidding
Ocala, FL

Dickerson Center Improvements
Renovation
Bidding
$1,600,000 to $2,100,000 est. value
Daytona Beach, FL 32114

The Reserve at Jensen Beach
New Construction
Post-Bid
$21,250,000 est. value
Jensen Beach, FL 34957

Orange Avenue Apartments
New Construction, Demolition
Post-Bid
$11,000,000 est. value
Tallahassee, FL

Clarence R. Kelly Community Center Park
New Construction - 4,180 SF
Results
Less than $2,700,000 est. value
Gainesville, FL 32641

Babcock Park Recreation Center Renovation
Results
Hialeah, FL 33010

The Pointe on Westshore
New Construction - 677,992 SF
Construction
$100,000,000 est. value
Tampa, FL 33600

The Gatherings at Lake Nona
New Construction - 195,460 SF
Construction
Orlando, FL 32827

Avalon Apartments
New Construction
Pending Verification
Largo, FL 33778

Hathaway Development
New Construction - 3,510,000 SF
Pending Verification
$10,000,000 CJ est. value
Jacksonville, FL 32244

Stellar Golden Glades
New Construction, Demolition
Conception
$1,000,000 to $5,000,000 CJ est. value
Miami, FL

Last Updated 03/10/2022 10:20 AM
Project Title

Construction Manager (CM) at Risk, Port Charlotte Beach Recreation Center

Physical Address View project details and contacts
City, State (County) Port Charlotte, FL 33952   (Charlotte County)
Category(s) Entertainment/Recreation
Sub-Category(s) Clubhouse/Social Club
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A. The site is located at 4500 Harbor Boulevard, Port Charlotte, Florida. B. The new facility is estimated at 20,000 square feet with final design determining the proper size within budget. C. Site lies within a residential community. D. Existing facility to remain in operation until transfer into new facility, then demolished. E. Provide utilities to the site

Details

Clubhouse/Social Club, 20,000 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents