Similar Projects
Olympia Hills
New Construction, Infrastructure
Design
$2,000,000,000 CJ est. value
Herriman, UT 84096

Chrome Works
New Construction, Infrastructure
Design
$35,000,000 CJ est. value
Salt Lake City, UT 84101

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Tax Commission Building Concrete/Irrigation Repairs
Infrastructure
Results
$195,000 est. value
Salt Lake City, UT 84103

Drilling Rig and Equipment Forge
Infrastructure
Results
Salt Lake City, UT 84108

Pura Vita Senior Housing
New Construction, Infrastructure
Construction
$6,000,000 CJ est. value
West Jordan, UT 84088

Thackeray Towns
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Sandy, UT 84070

South Main Street Apartments / Salt Lake City
New Construction, Infrastructure - 8,400 SF
Pending Verification
$150,000,000 CJ est. value
Salt Lake City, UT 84101

Brix
New Construction, Infrastructure
Design
$55,000,000 CJ est. value
Salt Lake City, UT 84101

Bueno Avenue Apartments
New Construction, Infrastructure
Post-Bid
$24,000,000 CJ est. value
Salt Lake City, UT 84102

Water Management System Forge
Infrastructure
Results
Salt Lake City, UT

Dowland Townhomes
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
South Salt Lake, UT 84115

At 2100 Apartments II
New Construction, Infrastructure
Design
$60,000,000 CJ est. value
Salt Lake City, UT 84115

Huntsman Mental Health Institute Utah Translational Research Facility
New Construction, Infrastructure - 185,000 SF
Post-Bid
$105,000,000 CJ est. value
Salt Lake City, UT 84108

Last Updated 06/07/2023 08:34 AM
Project Title

Pre-Qualified Paving & Site/Civil - DFCM TSOB Asphalt Improvements

Physical Address View project details and contacts
City, State (County) Taylorsville, UT 84129   (Salt Lake County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $709,545 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project is needed to improve the drainage and pavement as well as to add pedestrian paths. Sawcut existing asphalt. Remove existing asphalt pavement. Remove existing road base / subgrade to 11" below finish grades. Remove and dispose of existing wheel stops. Sawcut and remove existing curb and gutter. Sawcut and remove existing concrete sidewalk and accessible ramps. Remove and dispose of existing concrete paving. Remove and dispose of existing landscaping and irrigation system as required. Trim existing tree branches. Trim existing tree roots. Blackout or otherwise remove existing parking stall striping. Remove and dispose of existing signs. Cut and remove existing landscaping. Relocate existing boulders. Install existing irrigation lines in sleeves beneath new concrete. Over excavate an additional 12" of soft subgrade and fill with pit-run material. Provide and install stabilization fabric. New storm drain catch basin. Provide and install new concrete apron at catch basin. Provide and install 8" dia. SDR-35 pipe. Sawcut top of existing catch basin to install concrete apron. Provide and install new release curb & gutter. Provide and install new curb & gutter to match existing. Provide and install new concrete waterway. Provide and install concrete sidewalk. Provide and install accessible ramp with curb. Provide and install large concrete stair. Provide and install large concrete stair stainless steel handrail. Provide and install 6" wide curb wall. Install 8" road base. Install 3" asphalt. Install 8" wide solid white pedestrian aisle lines. Install 4" wide parking stall striping. Install new ADA symbol striping. Stripe accessible loading/unloading aisles. Provide and install new wheel stops. Provide and install new ADA parking sign. New 4" dia. concrete filled pipe bollard. Convert existing sprinkler system valve to drip irrigation at existing trees. Provide and install clean fill beneath topsoil. Provide and install new topsoil. Provide and install rock mulch over weed barrier fabric. Provide and install sod. Modify, adjust, and repair existing irrigation system. Flush system and clean-out debris from existing and new storm drain catch basins. General Conditions. Project mobilization. Erosion control, sweep, and dust control. Construction survey and staking. Traffic control and pedestrian safety. Question Submission Close Date 5/22/2023 3:00 PM MDT

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents