Similar Projects
Comprehensive Infrastructure for Tampa’s Neighborhoods - Design-Build
Design
Less than $4,362,009 est. value
Tampa, FL 33602

Gravity Sanitary Sewer Lateral Lining Technology Selection
Post-Bid
Sarasota, FL 34236

Rivertown Kendall Drive - Phase 2
New Construction
Post-Bid
Jacksonville, FL

J--Sanitary Sewage Lift Station
Results
West Palm Beach, FL 334106400

Replace Sewer Lift Station at USCG Station Panama City, Florida
Results
$250,000 to $500,000 est. value
Panama City, FL 32408

Bradley Road Booster Pump Station
Construction
Less than $7,884,680 est. value
Jacksonville, FL 32246

Tierra Verde Lift Station
New Construction
Construction
Tierra Verde, FL 33715

Private Lateral Line Rehabilitation Project
Post-Bid
Saint Petersburg, FL 33731

Professional Design Build Services for Construction Of The David L. Tippin Water Treatment Facility High Service Pump Station and Misc. Improvements
Results
Less than $50,000,000 est. value
Tampa, FL 33610

City of Cape Coral Fire Station #2
New Construction - 10,559 SF
Construction
Fort Myers, FL 33990

Bayshore Pumping Station Rehabilitation Design-Build
Post-Bid
Less than $3,500,000 est. value
Tampa, FL 33602

Phase I Wastewater Utility Upgrades
Results
Less than $2,703,260 est. value
Freeport, FL

Sulphur Springs Pumping Station Rehabilitation Design-Build
Post-Bid
Less than $16,800,000 est. value
Tampa, FL 33602

Rehabilitation of Lift Stations 14A, 15C, 17B, 19C, and 20CA
Results
Coral Springs, FL

Mirada Active Adult Phase 1 (Mirada Boulevard Phase 3B)
Post-Bid
San Antonio, FL 33576

Last Updated 11/26/2019 10:34 AM
Project Title

Force Main and Sewer PS Improvements - Pine Lakes Parkway and US 1

Physical Address View project details and contacts
City, State (County) Palm Coast, FL 32135   (Flagler County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,400,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of rehabilitation of five (5) existing sewer pump stations, including replacing the pumps, piping, valves, electrical and controls and at one of the pump stations, also installing a new generator. The Work also includes new sewer force main will be constructed from the southernmost of the four pump stations, PS 22-4, extending to the north along Pine Lakes Parkway, Commerce Blvd., and US 1, ending approximately 5450-ft north of Commerce Blvd., where it will connect to an existing 12” force main. The new force main construction consists of approximately 10690-ft of open cut force main (4”-12” PVC) and approximately 6300-ft of directional drill force main (8”-14” PE).

Details

Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents