Similar Projects
Old Highway Road Water Main Extension - Sieppel and Radford Road Loop - City of Dubuque
Infrastructure
Conception
$768,375 est. value
Dubuque, IA 52099

McFadden Farm Water Main Improvement(South Heacock Road From Chavenelle To Pennsylvania Avenue) - 740-2895
Infrastructure
Conception
$305,800 est. value
Asbury, IA 52002

Heritage Trail Peru Road Bank Stabilization
Infrastructure
Bidding
$350,000 CJ est. value
Dubuque, IA 52001

Lead Hazard Control 2839 Elm Street
Term Contract, Renovation, Infrastructure
Post-Bid
$50,000 CJ est. value
Dubuque, IA 52001

Water System Improvements 2021
Infrastructure
Results
$427,000 est. value
Dubuque, IA

Utility Extension 2022 Contract A Road Water Main
Term Contract
Results
$230,000 est. value
Dyersville, IA

Pennsylvania Avenue Widening - City of Dubuque
Infrastructure
Pending Verification
$15,000,000 CJ est. value
Dubuque, IA 52001

Reconstruct Taxiway Alpha - 390-2842 - City of Dubuque
Alteration
Conception
$9,945,000 est. value
Dubuque, IA 52003

Asbury Springreen Drive South and Sunset Drive Reconstruction
Infrastructure
Results
$2,000,000 est. value
Asbury, IA

Twin Ridge Subdivision - Lagoon Abandonment - 710-2754 - City Of Dubuque
Alteration
Conception
$465,000 est. value
Dubuque, IA 52003

HMA Resurfacing, Culvert Replacements, and Grading on Haberkorn Road
Infrastructure
Results
IA

Heeb Street Reconstruction - City of Dubuque
Infrastructure
Conception
$300,000 est. value
Dubuque, IA 52001

East Utility Extension 2022 Contract B Water Main
Infrastructure
Results
$1,000,000 est. value
Dyersville, IA

Bee Branch Interceptor Sewer Connection - 710-1298 - City of Dubuque
Infrastructure
Conception
Less than $3,200,000 est. value
Dubuque, IA 52001

Stoneman Road Reconstruction
Infrastructure
Results
$1,099,324 est. value
Dubuque, IA 52002

Last Updated 09/06/2022 11:05 AM
Project Title

Springreen Apartments Water Main Improvement Project

Physical Address View project details and contacts
City, State (County) Asbury, IA 52002   (Dubuque County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Any interested person may appear and file objections to the proposed plans, specifications or contract. After hearing objections, the CITY OF ASBURY, shall by resolution, enter its decision on the plans, specifications and contract. NOTICE IS HEREBY GIVEN: On September 13, 2022 at 7:00 p.m. at Asbury City Hall, Asbury, Iowa, the City Council of the City of Asbury shall consider the construction bids received and either award a contract, reject all bids, or adjourn action thereon to a subsequent meeting of the City Council. Effective July 1, 2010, per Senate File 2389 Iowa Code Chapter 26.3, paper copies of the BIDDING DOCUMENTS may be obtained at the office of MSA Professional Services, Inc., 400 Ice Harbor Drive, Suite 110, Dubuque, IA 52001 upon receipt of a refundable deposit of $75.00 for half size (11" x 17") set of plans. Any plan holder upon returning the BIDDING DOCUMENTS within 14 days after award of the project and in good condition will be refunded their deposit. Mailing costs for paper copies will be paid for by the Requestor. Each BIDDER shall accompany its bid with a bid security as security that the successful BIDDER will enter into a contract for the work bid upon and will furnish after the award of CONTRACT a corporate surety bond, acceptable to the OWNER, for the faithful performance of the CONTRACT, in an amount equal to 100 percent of the amount of the CONTRACT. The bid security shall be in an amount fixed by the OWNER and shall be in the form of a cashier's check, or certified check drawn on a state chartered or federally charted bank, or a certified share draft drawn on a state-chartered or federally chartered credit union. The Bid Bond shall contain no exceptions. By virtue of Statutory authority, a preference will be given to products and provisions grown and coal produced within the State of Iowa and to Iowa Domestic Labor, to the extent lawfully required under Iowa statutes. OWNER is designated a Tax Exempt Entity. As such, CONTRACTOR, and any subcontractors, under this contract, shall be provided a Tax Exempt Certificate and authorization letter from the OWNER. Tax Exempt certificate and authorization letter shall be used by CONTRACTOR to secure building materials or equipment intended for completion of this project without payment of sales tax. CONTRACTOR is not mandated to complete Iowa Department of Revenue Form 35002 - Iowa Contractor's Statement upon execution of agreement. CONTRACTOR agrees to this method of sales tax exemption and it shall not be modified during the course of construction. BIDDER shall satisfy themselves of the accuracy of the estimated quantities in the BID schedule by examination of the site and review of the contract documents; including ADDENDA. After BIDS have been submitted, the BIDDER shall not assert that there was a misunderstanding concerning the quantities of WORK or nature of the WORK to be done. The successful BIDDER shall be required to furnish a performance BOND and a payment BOND, each in the amount of 100 percent of the CONTRACT PRICE, with a corporate surety approved by the OWNER, within ten (10) calendar days of the date when the NOTICE OF AWARD is delivered to the BIDDER. The NOTICE OF AWARD shall be accompanied by the necessary AGREEMENT and BOND forms. In case of failure of the BIDDER to execute the AGREEMENT, the OWNER may at his option consider the BIDDER in default, in which case the BID BOND shall become property of the OWNER. BIDDERS must indicate on the BID form the proposed equipment and subcontractors who will be performing the major portions of the work. No BID submitted by any BIDDER which contains a condition or qualification shall be recognized or accepted by the OWNER and any letter or communication accompanying the BID which contains a condition or qualification upon the BID which has the effect of qualifying or modifying any provision of the contract documents in any manner will be construed as a qualifying BID and will be rejected by the OWNER as non responsive. No bidder may withdraw his bid within 60 days after the actual date of the opening thereof All work will commence following the issuance of a written notice to proceed. The work will be substantially completed on or before November 11, 2022. All work will be finally complete and ready for final payment in accordance with Paragraph 14.07 of the General Conditions on or before April 28, 2023. OWNER reserves the right to waive any informalities or to reject any or all bids.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents