Similar Projects
Emmaus Commerce Center
Alteration
Post-Bid
Emmaus, PA 18049

Cedar Creek Parkway West - Phase 2 Development Project
Results
Allentown, PA 18104

South Bethlehem Corridor Connections
Results
$200,000 to $499,999 est. value
Bethlehem, PA

Coopersburg Streetscape Phase 4
Results
$2,500,000 to $4,999,999 est. value
Coopersburg, PA

Firebreak Construction PGC South East Region 211, 217 and 257
Results

2021 Curb and Concrete Contractor
Results
$30,000 to $40,000 est. value
Emmaus, PA 18049

2021 Handicap Ramps, Curb and Sidewalk Improvements
Results
Fullerton, PA 18052

2021 11 Street Overlay and Curb Ramps
Results
$600,000 to $800,000 est. value
Bethlehem, PA

Sitework
Results
Allentown, PA

2021 CDBG ADA Pedestrian Ramp Program (Various Locations)
Infrastructure
Results
Allentown, PA

Parkway Manor Elementary School Student Drop-Off Improvements
Infrastructure
Results
Allentown, PA 18104

Parking Lot at N. 7th Street and N. Penn Street
Infrastructure
Results
Allentown, PA 18102

2020 CDBG East Church Street and ADA Improvements
Infrastructure
Results
Slatington, PA 18080

Allentown Jordan Creek Greenway Trail
Infrastructure
Results
$2,500,000 to $4,999,999 est. value
Allentown, PA

2021 Curb and Sidewalk Work for the 2022 Streets Program (Various Locations)
Infrastructure
Results
Allentown, PA

Last Updated 02/03/2022 04:31 PM
Project Title

Accessible Secondary Entry Project

Physical Address View project details and contacts
City, State (County) Schnecksville, PA 18078   (Lehigh County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

For a “New Accessible Secondary Entry” to the Lehigh Valley Zoo including but, not limited, to:1. New accessible, compacted gravel entry ramp with metal and composite railings to connect with an existing concrete pedestrian pathway in the Zoo. 2. New accessible compacted gravel entry plaza with curb cut to provide access from existing parking lot. 3. Related excavation, filling, and other site work necessary for entry ramp and plaza construction. 4. Boulders at plaza perimeter (boulder placement, type/size TBD based on availability and to be coordinated between contractor and architect; size shown on plan is desired). 5. Grading up to plaza surface and filling in around and between boulders. 6. Grading up to ramp surface. 7. New lockable chain link entry gate to match existing fencing. 8. New lighting for platform and entry ramp (to be mounted on railing posts).

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents