Similar Projects
Last Updated | 07/27/2021 08:16 AM |
Project Title | James E. Anderson Reverse Osmosis Water Treatment Membrane Replacement |
Physical Address | View project details and contacts |
City, State (County) | Port Saint Lucie, FL (Saint Lucie County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Contractor/Original Equipment Manufacturer (OEM) to replace aging RO membrane elements in skids 1-10 and provide the equipment, materials, appurtenances, labor and associated warranties to supply and install the designed membrane train upgrades at the James E. Anderson Water Treatment Facility. The City will be replacing membranes for all skids over the course of the 5-year replacement schedule. The OEM shall provide all materials and services as required to manufacture, store, install, as well as provide performance testing of the membrane system upgrades for skids 1-10 at the James E. Anderson Water Treatment Facility (WTF) in accordance with specified requirements. Skids 1-10 each will operate with a two-stage, 32:16 array configuration with the first stage consisting of thirty-two (32) pressure vessels and the second stage consisting of sixteen (16) pressure vessels. Each pressure vessel houses seven (7) membrane elements for a total of three hundred thirty-six (336) membrane elements per skid. The City has pre-selected and procured membrane elements for the full facility replacement. This Contract is for installation of the replacement membrane elements, upgrades to the membrane trains, and ancillary upgrades to skids 1-10 as requested by the City within the term of the contract. Installation of replacement membranes, interconnectors, O-rings, gaskets, end adaptors, membrane train upgrades, workmanship warranty, and material warranty for the items provided and installed by the OEM. This includes all work necessary for the upgrades to furnish and install pressure vessels, interconnectors, adaptors, gaskets, O-rings, piping and valve modifications, instrumentation replacements and/or upgrades on RO skids, and general process upgrades as requested by the City. This also includes replacement of end adaptor stainless steel snap rings on the vessels of skids 1-3. The City will pre-select and procure membrane elements for installation by the OEM. The OEM will be required to receive, store (if necessary), and install the membrane elements procured for replacement. The scope of work also includes performance testing along with start-up testing services for each train individually. |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Details | Water Treatment Plant, Renovation.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |