Similar Projects
Hudson Place Mixed Use
New Construction - 25,000 SF
Design
Newburgh, NY 12550

Water Treatment Plant
Design
Less than $7,400,000 est. value
Rouses Point, NY 12979

Wawarsing Water District Water Treatment Plant and Well Field
New Construction
Bidding
Ellenville, NY

Lake Ontario Water Treatment Plant Improvements
Renovation
Bidding
Oswego, NY 13126

City of Hornell Wastewater Treatment Plant Upgrades
Post-Bid
Less than $1,700,000 est. value
Hornell, NY 14843

2020 Chemical Systems Maintenance and Repair Services
Term Contract
Post-Bid
Greenburgh, NY 10607

Waste Management Steam Boiler Replacement
Renovation
Results
$290,000 to $310,000 est. value
Ithaca, NY 14853

Wastewater Treatment Plant Improvements Phase 2
Results
Leon, NY

Village of Little Valley WWTP Upgrades Contract 2
Construction
Less than $3,000,000 est. value
Little Valley, NY 14755

Wastewater Treatment Plant Nutrient Removal and Disinfection Improvements
Construction
Less than $3,000,000 est. value
Painted Post, NY 14870

Cayuga Heights Wastewater Treatment Plant - Phase 2
Renovation
Bidding
Ithaca, NY 14850

Upgrades to the Water Treatment Plant's Junction Chamber and Pretreatment Buildings (AS)
Post-Bid
Yonkers, NY 10703

Town of Stark Water District No. 1 Improvement Project
Results
Less than $1,900,000 est. value
Fort Plain, NY

Corfu Wastewater Treatment Facility Expansion
Construction
Less than $4,350,000 est. value
Corfu, NY 14036

Interior and Exterior Process Piping Improvements
Renovation
Bidding
Niagara Falls, NY 14303

Reported 12/09/2019 12:42 PM
Project Title

Water Pollution Control Facility Upgrades - Phase II

Physical Address View project details and contacts
City, State (County) Westfield, NY 14787   (Chautauqua County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method
Project Status Construction Commenced February 2019
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contract 18-1G - General Construction Contract 18-1E - Electrical

Details

Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents