Similar Projects
NextGen Precision Health Facility
New Construction - 323,400 SF
Design
$232,000,000 est. value
Columbia, MO 65201

Z1DZ--657-21-711JB EHRM Cerner Admin Space Construction Support - Jefferson Barracks
New Construction, Addition
Design
Saint Louis, MO 63125

WMMC Sterile Processing
Renovation
Bidding
Warrensburg, MO 64093

Salt Dome Drag Chain and Belt Conveyor Services
Post-Bid
MO

Elevator Inspections and Maintenance
Alteration
Post-Bid
Saint Charles, MO

New Headquarters Station
New Construction
Results
Ozark, MO 65721

Stainless Steel Salt Conveyor
Alteration
Results
Macon, MO 63552

Mercy Ballas Multispecialty Building
New Construction - 272,000 SF
Construction
$10,000,000 CJ est. value
MO

Sana Lake Recovery Center
Renovation, Addition
Pending Verification
Kansas City, MO

Sana Lake Recovery Center
Renovation, Addition
Pending Verification
Kansas City, MO

Siteman Cancer Center Ambulatory Care Facility
New Construction - 589,232 SF
Design
$10,000,000 CJ est. value
Saint Louis, MO 63108

Renovate Optometry for New Procedure Suite
New Construction, Renovation, Term Contract
Post-Bid
$500,000 to $1,000,000 est. value
Saint Louis, MO

EHRM Cerner Admin Space Support
Addition
Results
Saint Louis, MO 63106

Second Floor Center - Building 52
Renovation - 7,200 SF
Design
$2,000,000 to $5,000,000 est. value
Bella Villa, MO 63125

Mental Health Center
Addition
Post-Bid
Chillicothe, MO 64601

Last Updated 12/17/2021 09:37 AM
Project Title

Replace Elevators in Buildings 1 and 15

Physical Address View project details and contacts
City, State (County) Independence, MO 64052   (Jackson County)
Category(s) Medical, Single Trades
Sub-Category(s) Conveying Systems, Hospital
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value $2,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project 589-22-410, Replace Elevators in Buildings 1 and 15: ontrols and certain component parts listed below for the elevators in buildings 1 and 15 have reached the end of their useful life thus require replacement. The Traffic Dispatch algorithm is outdated, and a more efficient self-learning system will help address the increase in patient activity in buildings 1 and 15. Building 1 elevators 1-5, building 15 elevators 9 and 10 will require many pieces of equipment and component parts to be replaced all to be compliant with 2019 ASME 17.1 elevator code. Additional work requirements include Remove old, damaged entrance side jambs. Install new entrance side jambs at all location. Jambs shall be 3.5 radius constructed of not less than 14 GA stainless steel. Drive machine and deflector sheave assembles are to be evaluated, reconditioned, or replaced and certify for 30 years continuous use. Overhead sheave assembles are to be evaluated, reconditioned, or replaced and certify for 30 years continuous use. All wiring will be replaced. Wire ways and conduit will be reused and or replaced as required. Elevators will be balanced, tested, and certified at their rated speed and capacity. The contractor will employ an independent third-party inspection, test, and certification professional to witness all final acceptance tests. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures.

Details

Hospital, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Joists, Metal Support Assemblies, Healthcare Metal Supports.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Painting.
Division 10 - Specialties, Compartments and Cubicles, Toilet Compartments, Partitions, Service Walls, Patient Bed Service Walls, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Protective Covers.
Division 11 - Equipment, Mercantile and Service Equipment, Vending Equipment, Foodservice Equipment, Ice Machines, Cleaning and Disposal Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Operating Room Equipment, Solid Waste Handling Equipment.
Division 12 - Furnishings, Window Blinds, Casework, Furniture, Seating, Institutional Furniture, Healthcare Furniture.
Division 13 - Special Construction, Radiation Protection.
Division 14 - Conveying Equipment, Elevators.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Substations, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems, Healthcare Intercommunications and Program Systems, Healthcare Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Radiation Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents