Similar Projects
Fort Myers Brewing Campus
New Construction - 10,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Fort Myers, FL 33990

PT Land Apartments
New Construction, Renovation
Conception
Cape Coral, FL 33904

Oak Villages
New Construction
Design
$10,000,000 est. value
Fort Myers, FL 33966

Embers Lake Estates
New Construction - 4,673,403 SF
Design
Cape Coral, FL

Avenida Fort Myers
New Construction
Bidding
Fort Myers, FL 33908

Avenida Fort Myers
New Construction
Bidding
Fort Myers, FL 33908

Palmera on the River
New Construction
Post-Bid
$56,600,000 est. value
Fort Myers, FL

Walmart 0-2--TENANTBID--2021 - Bundle #2
Renovation
Post-Bid

Development of Waterway Estates Property
New Construction
Results
Fort Myers, FL 33903

Co-Developer for Affordable Housing Development In Lee, Collier, Charlotte, and Hendry/Glades Counties
Results

Bay Harbour Marina Village
New Construction
Construction
$10,000,000 CJ est. value
Fort Myers Beach, FL 33931

Bay Harbour Marina Village
New Construction
Construction
$10,000,000 CJ est. value
Fort Myers Beach, FL 33931

Soltura at East Terry
New Construction
Conception
Bonita Springs, FL 34135

Sanibel Passage
New Construction - 76,500 SF
Design
$42,000,000 est. value
Fort Myers, FL 33908

Target #1454 - 2021 Clubhouse Special Project
Renovation
Post-Bid
Cape Coral, FL 33914

Reported 03/09/2022 07:02 AM
Project Title

Paradise Isle

Physical Address View project details and contacts
City, State (County) North Fort Myers, FL   (Lee County)
Category(s) Commercial, Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Beach Facility/Marina, Golf Course, Multi-Family Homes, Parking Garage, Retail
Contracting Method Construction Manager to Subcontract.
Project Status Project Delayed
Bids Due View project details and contacts
Estimated Value $600,000,000 to $1,000,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project to Include: Two 20-story, 300-unit multifamily buildings adjacent to existing conservation area on the far southwest side of the property Two 12-story, 100-unit towers and three-story townhomes An expanded marina that will include 200 slips A 200-slip dry boat storage building to the west of the marina A 16-acre mixed-use area that will include restaurants, office space, parks, retail space, a hotel, sales center, golf clubhouse, multifamily residences, health and spa facilities and parking spaces A parking garage Updates and enhancements to the 18-hole golf course Sidewalks throughout the development and a paved public pathway by the water.

Details

1 Retail, Approximately 100,000 SF New Construction, Multi-Family Homes, 3 Stories Above Grade, New Construction, 100, 1 Golf Course, Renovation, 2 Apartments/Condominiums, 20 Stories Above Grade, New Construction 600 Unit(s), 2, 12 Stories Above Grade, New Construction 200 Unit(s), 1 Beach Facility/Marina, New Construction 200 Slip(s), 1 Parking Garage, New Construction, 270 Acres.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Heavy Timber Construction, Heavy Timber Pier Construction, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Loading Dock Equipment, Residential Equipment, Residential Appliances.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Security Access Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents