Similar Projects
Herron Hill Reservoir Improvements: Sodium Hypochlorite Building - Plumbing Construction
Alteration
Bidding
$70,918 est. value
Pittsburgh, PA

Deep Underground Utilities - Plumbing
Alteration
Bidding
Pittsburgh, PA 15231

On Call Plumbing Services
Term Contract
Post-Bid
Pittsburgh, PA 15222

Early Site Access at Pittsburgh International Airport - Plumbing & Fire Protection
Post-Bid
Pittsburgh, PA 15231

Bedford Dwellings Plumbing Lines Services, AMP-02
Results
Pittsburgh, PA 15219

West Allegheny High School Science Rooms Renovations - Plumbing Construction
Results
Imperial, PA 15126

Independence Park Sanitary Sewer Replacement Project - Phase 1
Renovation
Construction
$218,000 est. value
Clinton, PA 15026

(45) Bottle Filling Stations
Alteration
Bidding
Plum, PA 15239

Phase 3 Interior Improvements at Parkway West Career - Plumbing Construction
Post-Bid
Oakdale, PA 15071

South Hills Village Rail Center Pit Restoration and Parking Garage Restoration - Plumbing Contract
Results
Less than $1,000,000 est. value
Pittsburgh, PA 15241

Penthouse Addition for the Municipality of Mount Lebanon Firing Range Building - Plumbing/ Mechanical Construction
Alteration
Bidding
$63,000 est. value
Mount Lebanon, PA 15228

Cathedral of Learning Ground Floor Renovation - Plumbing and Fire Protection Construction
Post-Bid
$675,000 to $725,000 est. value
Pittsburgh, PA 15260

Moon Park Maintenance Building - Plumbing Construction
Results
$70,822 est. value
Moon, PA 15108

6-Story Parking Garage in the Pittsburgh Technology Center - Plumbing
Infrastructure
Bidding
Pittsburgh, PA 15213

General, Electrical, Plumbing, Building & Yard Emergency Services
Term Contract
Post-Bid

Last Updated 06/18/2021 10:30 AM
Project Title

East Headworks - Plumbing

Physical Address View project details and contacts
City, State (County) Pittsburgh, PA   (Allegheny County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $934,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The East Headworks will provide preliminary treatment for a peak flow of 360 MGD. This contract is part of the overall wet weather plant expansion and will generally include the following: Modification of the Main Pumping Station to direct flows to the East and West Headworks facilities. 120-inch diameter conduit between the Main Pumping Station and the East Headworks. Six (6) mechanically cleaned bar racks and screenings conveying. Six (6) aerated grit tanks, grit pumping, concentrating and classifying equipment. Operations area that includes a control room, locker room, and break area. Removal of the West Headworks venturi flow meter. Replacement of the 120-inch diameter primary influent conduit. East, West and Center Primary Influent Conduits. Upgrade of the Headworks Odor Control System Modification of existing below grade pipe galleries. Various modifications to the existing West Headworks.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents