Similar Projects
Bridge-Repair/Rehabilitation
Results
$211,295 est. value
Dania Beach, FL

Bascule Bridge Rehabilitation
Results
$1,270,037 est. value
Pompano Beach, FL

Repairs to Seven Bridges
Renovation
Results
Lighthouse Point, FL

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Structure Repair Pushbutton - Bridges - Districtwide Structures Repairs Pushbutton - Bridges
New Construction, Infrastructure
Results
$1,000,000 est. value

RR Intermediate Bridges - SR A1A/17TH ST/Over Mercedes River-Bridge-REP/REH
New Construction, Infrastructure
Results
$1,719,343 est. value
FL

Orange Drive Pedestrian Bridge Improvements
Results
$95,095 est. value
Davie, FL 33324

Volunteer Park Pavilion Bridge Repair
Results
Plantation, FL 33323

R and R Minor Bridge
New Construction
Results
$727,043 est. value
FL

Bridge and Miscellaneous Structures Maintenance and Repairs
Renovation, Term Contract
Results
$1,350,000 est. value
FL

Bascule Bridge Rehabilitation
New Construction
Results
$10,269,081 est. value
FL

SR-5/US-1 Dania Cutoff Canal Bridge 860001 - R and R Minor Bridge
New Construction, Infrastructure
Post-Bid
$1,055,801 est. value
Dania Beach, FL 33004

Bridge Rehabilitation/(Tunnel)/Architectural Bldg. Rehabilitation/Lighting
New Construction
Results
$26,625,818 est. value
FL

Bascule Bridge Rehabilitation
New Construction
Results
$1,637,623 est. value
FL

Bridge Structure Repair
New Construction
Results
$400,000 est. value

Last Updated 05/19/2022 04:25 PM
Project Title

11th Avenue Swing Bridge Rehabilitation

Physical Address View project details and contacts
City, State (County) Fort Lauderdale, FL 33332   (Broward County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is located at SW 11th Avenue Swing Bridge, across the New River North Fork, in the City of Fort Lauderdale. The work to be accomplished under this contract includes, but is not limited to, removal of corrosion from the mechanical gears that enable the bridge to rotate, open and allow watercrafts to navigate the river, application of corrosion inhibitors to protect the mechanical gears, relocate the electrical box one and a half feet above its current location.

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents