Similar Projects
Paradise Irrigation District Community Power Resiliency Project
New Construction
Post-Bid
Paradise, CA

Grayson Repowering Unit 9 Separation
Renovation
Post-Bid
Glendale, CA

Scripps Mercy Hospital Encinitas Central Plant Upgrade and Seismic Retrofit
Renovation
Design
Encinitas, CA 92024

Military Ocean Terminal Concord (MOTCO) Wharf 2 Generator Site Work
New Construction
Post-Bid
$1,000,000 to $5,000,000 est. value
Concord, CA 94520

Hoag Hospital Irvine Expansion
New Construction, Addition - 492,290 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Irvine, CA 92618

Reported 04/28/2022 12:00 AM
Project Title

Proposed Grayson Repowering Project Unit 9 Separation

Physical Address View project details and contacts
City, State (County) Glendale, CA   (Los Angeles County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Power Plant
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $3,500,000 to $4,500,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: Contractor shall furnish labor, materials, equipment, services, and specialized skills to perform work involved in the Project. The Work included in the Bid is defined in the Project Drawings and Specifications and will generally include: • Separation of Grayson Unit 9 from other plant services that will be demolished, and replacement with alternate services such that Unit 9 can operate independently during the demolition and construction phases of the repowering project. • Separation of Grayson Units 1-8, which are to be demolished, from plant utilities so that the units can be safely demolished and the utilities can continue to serve Unit 9. • Relocation of plant utilities that must remain during demolition and construction but must be relocated out of the areas to be demolished. The Work will be performed in three phases: • Phase 1 – All Work that can be done while all of the units remain in operation as well as all pre-work for Phase 2. • Phase 2 – All of the units, including Unit 9 will be shut down. Because all units will be shut down, this Work must be completed within a two-week time period. After Phase 2, only Unit 9 will be capable of operation. • Phase 3 – Completion of any remaining Work. Such Work cannot impact the operability of Unit 9. Completion of Phase 3 is a prerequisite to the start of demolition which is the subject of a different Request for Proposals.

Details

Power Plant, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, High-Performance Structural Concrete, Concrete Finishing, Specialty Placed Concrete, Precast Structural Concrete, Precast Concrete Specialties.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Access Doors and Panels, Coiling Doors and Grilles, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Exterior Specialties, Security Mirrors and Domes.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Security Equipment.
Division 13 - Special Construction, Radiation Protection, Special Instrumentation, Seismic Instrumentation.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Personal Protection Systems, Electronic Detection and Alarm, Fire Detection and Alarm, Radiation Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Earthwork Methods, Soil Treatment, Soil Stabilization.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Fuel Distribution Utilities, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Utility Transformers, High-Voltage Switchgear and Protection Devices, Medium-Voltage Utility Switchgear and Protection Devices, Communications Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors, Cranes and Hoists.
Division 46 - Water and Wastewater Equipment.
Division 48 - Electrical Power Generation, Common Work Results for Electrical Power Generation, Instrumentation and Control for Electrical Power Generation, Electrical Power Generation Equipment, Electrical Power Generation Testing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents