Similar Projects
Parking Lot Expansion - ESC
Post-Bid
Wylie, TX 75098

Hardscape Improvements for the Sage 3 Neighborhood and Prairie Crossing Re-Alignment in the Light Farms Project
Post-Bid
Celina, TX 75009

Frisco Ranch Amenity Pond Improvements
Results
$350,000 est. value
Frisco, TX 75034

Phase 2 Paving Package for Bridgewater
Results
TX

Dominion Hike and Bike Trail
Results
Less than $1,000,000 est. value
Frisco, TX 75034

12" Waterline and Sidewalk
Results
Princeton, TX 75407

Residential Concrete Pavement Maintenance
Results
$1,850,000 est. value
Plano, TX 75074

Caldwell Park Phase 2B-Multi-Use Fields 1 and 2
Results
Princeton, TX 75407

Twin Lakes Park Trail Project
Results
$300,000 est. value
Wylie, TX 75098

Bob Woodruff Southeast Trail Replacement
Results
$398,076 est. value
Plano, TX 75074

Prosper Elementary School #12 (Sam Johnson Elementary)
Results
$73,740 est. value
Celina, TX 75009

District Football Stadium Drainage Improvements
Results
Farmersville, TX 75442

2020 Sidewalk Improvements
Results
Frisco, TX 75034

Environmental Services Building Parking Lot and Lighting Expansion
Results
Less than $168,500 est. value
Wylie, TX 75098

Legacy Drive at Dallas North Tollway Pedestrian Crossing Project
Results
$1,200,000 est. value
Plano, TX

Last Updated 03/11/2021 11:39 AM
Project Title

Sidewalk Improvements - Plano Parkway from Independence Parkway to Alma Drive Project

Physical Address View project details and contacts
City, State (County) Plano, TX   (Collin County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,440,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of roadway, sidewalk/trail and driveway improvements along Plano Parkway between Independence Parkway and Alma Drive. The project also includes construction of two pedestrian bridges crossing both Pittman and Prairie Creeks along the proposed trail alignment.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents