Similar Projects
Beaver Lane (Wilmette Avenue to North End) - Village of Glenview
Infrastructure
Conception
$309,600 CJ est. value
Glenview, IL 60025

Beaver Lane (Wilmette Avenue to North End) - Village of Glenview
Infrastructure
Conception
$309,600 CJ est. value
Glenview, IL 60025

Pleasant Lane (Waukegan Road to Sunset Ridge) - Village of Glenview
Infrastructure
Conception
$2,060,000 CJ est. value
Glenview, IL 60025

248th Avenue - 95th Street to 103rd Street - SC190 - City of Naperville
Infrastructure, Renovation
Conception
$7,175,000 CJ est. value
Naperville, IL 60564

Parking Lot Resurfacing - Village of Park Forest
Infrastructure
Conception
$300,000 CJ est. value
Park Forest, IL 60466

Traffic Signal at US30/Indiana Street - Village of Park Forest
Infrastructure
Conception
$300,000 CJ est. value
Park Forest, IL 60466

Lincoln Avenue South of Wascher Drive To South of Killarney - City of Urbana
Infrastructure
Conception
$1,930,550 CJ est. value
Urbana, IL 61801

James Park - Pathway Reconstruction - City of Evanston
Infrastructure
Conception
$950,000 CJ est. value
Evanston, IL 60202

108th Avenue 13-W7509-02-FP - Cook County
Infrastructure
Conception
$12,971,733 CJ est. value
Orland Park, IL 60467

Church Street Bike Lane Project - Village of Skokie
Infrastructure
Conception
$220,000 CJ est. value
Skokie, IL 60076

Evergreen/ Maude Drainage Improvements - SW-19-01 - Village of Arlington Heights
Infrastructure
Conception
$400,000 CJ est. value
Arlington Heights, IL 60004

United North Parking Lot Rehabilitation - 41390 - Design and Construction - City of Chicago
Infrastructure
Conception
$370,500 CJ est. value
Chicago, IL 60666

Terminal Building ADA Improvements - 41404 - City of Chicago
Infrastructure
Conception
$4,663,750 CJ est. value
Chicago, IL 60666

Provident Hospital Sewer Replacement - Cook County
Infrastructure
Conception
$1,500,000 CJ est. value
Chicago, IL 60615

Mapleton Road - HW-2017-003H - County of Peoria
Infrastructure
Conception
$320,000 CJ est. value
Hollis Township, IL 61547

Last Updated 06/20/2023 08:08 AM
Project Title

Crack and Joint Seal on I-70

Physical Address View project details and contacts
City, State (County) Greenville, IL 62246   (Bond County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Request for Qualifications, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $116,268 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

4.8 miles of crack and joint seal on I-70 from BN Railroad to the Fayette County line. Region 5 District 8 Federal Project # County(S) Bond Key Route(S) FAI 70 Marked Route(S) I-70 Section(S) 3-5CJS-1 State Job #(S) C-98-092-22 Pps #(S) 8-00847-0000 20 Working Days Questions not accepted as of June 06, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 07, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 149 - Crack and Joint Seal on I-70 This project is located on I-70 from the structure crossing BN Railroad to the Fayette County line. This project consists of joint and crack sealing and all other necessary and collateral work to complete the project as shown on the plans and as specified in these special provisions.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents