Similar Projects
Coleman A. Young International Airport Expansion
Renovation, Alteration
Conception
$2,250,000 est. value
Detroit, MI 48213

Senior Center Parking Lot Replacement
Term Contract
Bidding
$200,000 est. value
Rockwood, MI 48173

Bridge Reconstruction, Concrete Curb and Gutter and Pavement Markings on Merriman Road
New Construction, Infrastructure
Bidding
$6,975,000 est. value
Garden City, MI 48135

Greenhouse Installation at Garfield Community School Bid
Post-Bid
Livonia, MI 48150

Two Year Contractual Services Contract for Asphalt Repair
Term Contract
Post-Bid
Romulus, MI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

North Fishing Site Redevelopment
Results
Belleville, MI 48111

Hot Mix Asphalt Crack Treatment
Infrastructure
Bidding
$478,000 est. value
Dearborn Heights, MI

Bundle 3 Rest Areas Ada Eastern Lower Peninsula - Exterior
Post-Bid

Installation of Asphalt Walking Track at Jefferson Elementary School Project
Results
Redford, MI 48239

2022 Alley Replacement Program
Infrastructure
Bidding
$600,000 CJ est. value
Hamtramck, MI 48212

USCG Repair Asphalt Roads, Detroit, MI
Post-Bid
$500,000 to $1,000,000 est. value
Detroit, MI

2021/2022 Sidewalk and Concrete Repair Program Water Main Breaks
Results
Livonia, MI

Hot Mix Asphalt Cold Milling and Resurfacing, Concrete Curb, Gutter, Sidewalk and Ramps and Pavement Markings
Infrastructure
Bidding
$13,147,000 est. value
Detroit, MI

Pavement Reconstruction on West Jefferson Avenue
Alteration
Post-Bid
Detroit, MI

Last Updated 07/26/2022 04:08 PM
Project Title

Sidewalk Replacement Program Phase 1

Physical Address View project details and contacts
City, State (County) Inkster, MI 48141   (Wayne County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of July 26 2022, the project will rebid. A timeline for a rebid has not yet been determined.** The City of Inkster has allocated funds for the replacement of city sidewalks in city Section 1. Section 1 is bound by Henry Ruff to the west, Middle Belt to the east, Avondale to the South, and Cherry Hill to the north. Sidewalk and ramps will be replaced city-wide in a multiyear replacement approach. Buyers Requirements General Requirements - Insurance Required - Contractors License Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % Job Location City of Inkster Question Acceptance Deadline 05/27/2022 04:00 PM EDT Questions are submitted online Yes

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents