Similar Projects
Sanders Pump Station Repairs
Infrastructure
Conception
Sanders, KY 41083

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Installing a New Overlay on the Tennis Courts at Robert Westrick Memorial Park
Infrastructure
Post-Bid
$500,000 CJ est. value
Carrollton, KY 41008

Sidewalks and Curbs at the William L. Wheeler Hall of Justice
Infrastructure
Construction
$55,005 CJ est. value
Carrollton, KY 41008

North American Stainless Manufacturing Facility
New Construction, Infrastructure - 4,400,000 SF
Pending Verification
$244,000,000 CJ est. value
Ghent, KY 41045

LG&E Carrollton Operations Center
New Construction, Infrastructure - 10,500 SF
Post-Bid
$2,000,000 CJ est. value
Carrollton, KY 41008

Drainage Project
Infrastructure
Post-Bid
$300,000 CJ est. value
Sanders, KY 41083

Exit 34 Sewer Extension
Infrastructure
Post-Bid
$300,000 CJ est. value
Carrollton, KY 41008

Sidewalk Bid
Infrastructure
Post-Bid
$200,000 CJ est. value
Sanders, KY 41083

Asphalt Pavement and Roadway Rehabilitation - KY Highway 36 (Ky 36)
Infrastructure
Post-Bid
$2,579,938 CJ est. value
Carrollton, KY 41008

Open Cover Pavilion
New Construction, Infrastructure
Post-Bid
$50,000 CJ est. value
Carrollton, KY 41008

2023 AMR/AMI Project
Infrastructure
Post-Bid
$300,000 CJ est. value
Carrollton, KY 41008

Pavement (With Alternates) - KY 227
Infrastructure
Post-Bid
$678,063 CJ est. value
Worthville, KY 41098

Parks - GB-Lodge Pool Repairs
Infrastructure
Post-Bid
$176,250 CJ est. value
Carrollton, KY 41008

Parks - GB-Lodge Pool Repairs
Infrastructure
Post-Bid
$176,250 CJ est. value
Carrollton, KY 41008

Last Updated 07/26/2023 06:04 AM
Project Title

Ledge Pool Repair General Butler State Park

Physical Address View project details and contacts
City, State (County) Carrollton, KY 41008   (Carroll County)
Category(s) Entertainment/Recreation, Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Swimming Pool(s), Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $227,845 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Work includes removing and replacing existing PVC pool liner at Lodge Pool and Wading Pool at General Butler State Resort Park. Existing pool lights will be deleted prior to new PVC membrane installation. Miscellaneous repairs in the Equipment Room are also included in the scope All bids shall be accompanied by a bid guarantee (in the form of a bid bond or certified check) of not less than five (5%) percent of the amount of the lump sum base bid. A 100% Performance Bond and a separate 100% Payment Bond shall be furnished by the successful bidder. All bonding and insurance requirements are contained in the Instructions to Bidders and/or General Conditions. Bonds should be executed by a surety company authorized to do business in the Commonwealth of Kentucky The Division of Engineering and Contract Administration, Commonwealth of Kentucky, reserves the right to reject any and all bids and to waive all informalities and/or technicalities where the best interest of the Commonwealth may be served. Bids will be received from Prime Contractors on a Lump Sum Bid Basis for the total project. Estimated Length of Project: 120 (Substantial Completion) + 30 (Final Completion) NO QUESTIONS WILL BE ANSWERED AT THE SITE VISIT. ALL TECHNICAL QUESTIONS SHALL BE EMAILED TO THE ARCHITECT/ENGINEER OF RECORD FOR THIS PROJECT. ALL PROCUREMENT QUESTIONS SHALL BE DIRECTED TO BUYER OF RECORD FOR THIS PROJECT.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing.
Division 09 - Finishes, Special Coatings, Cementitious Coatings.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 26 - Electrical, Special Purpose Lighting, Underwater Lighting.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents