Similar Projects
Design/Build Fort Island Trail Multi-Use Path
Infrastructure
Bidding
$1,000,000 est. value
Crystal River, FL 34429

Asphaltic Concrete for Surface/Leveling Courses Including Sand Seal Coat
Infrastructure
Bidding
FL

Public Works & Bank of Inverness Parking Lot Reclamation Project
Post-Bid
Inverness, FL 34452

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Resurfacing of Citrus County Road - North Forest Ridge Boulevard from West Lake Beverly Drive to CR 491
Results
Less than $705,840 est. value
FL

Construction Services for The Beverly Hills West Septic Tank Phase-Out
Results
Beverly Hills, FL

Asphalt and Sidewalk Rehabilitation
Infrastructure
Bidding

Residential Road Resurfacing Project (FY 20/21)
Results
Less than $4,300,000 est. value
Lecanto, FL 34461

Silicone Joint Sealer
Infrastructure
Bidding

Sidewalk/Base Work/Milling and Resurfacing/Drainage Improvements
Results
Less than $925,000 est. value
Crystal River, FL 34428

Paving and Striping Services
Results
FL

Asphalt Repair and Maintenance
Results
Less than $100,000 est. value

Sidewalk/Drainage Improvements
Results
$1,993,000 est. value
FL

Vine Street Sidewalk Replacement
Results
Inverness, FL 34450

Covered Walkway Inverness Primary School
Term Contract
Results
Inverness, FL 34452

Last Updated 02/10/2022 08:22 AM
Project Title

Road Resurfacing Project for West Citrus Springs Boulevard, North Deltona Boulevard and South Canary Palm Terrace

Physical Address View project details and contacts
City, State (County) Citrus Springs, FL   (Citrus County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project 1 - Resurfacing services for two lanes of W Citrus Springs Blvd from N Santos Dr to US41, approximately 2.33 miles per lane (Attachment “A”). This includes limited milling of 1.5”, applying a lift of 1.5” of Open Grade Hot Mix Asphaltic Concrete with a PG 76-22 polymer, and an asphalt finish course of 1.5” of FC 12.5 with PG 76-22 polymer. - Traffic Level C, pursuant to the current FDOT Standard Specifications for Road and Bridge Construction, July 2021. The Contractor, at their discretion, may choose to use an asphalt finish course of 1.5” of FC 12.5 - Traffic Level C in all median cross overs and adjacent road turnouts within the project work area. Work also includes, but is not limited to, the removal and construction of sidewalk segments (the saw cut and removal/replacement of the existing sidewalk will occur at the nearest existing joint and new sidewalk segments must meet all ADA and Standard specifications), removal and construction of driveway aprons, installing detectable warnings, removal and replacement or reinstallation of mailboxes, exposing and cleaning edge of existing pavement, limited milling, butt milling, paving, temporary and permanent pavement markings, redressing, installing bicycle markings and signage, installing new R.P.M.s, shoulder grading (Contractor is responsible for providing positive drainage away from the roadway surface and sidewalks), sodding, and other items. Project 2 - Resurfacing services for two lanes of N Deltona Blvd from W Homeway Loop to W Citrus Springs Blvd, approximately 3100 feet per lane (Attachment “A”). This includes applying a lift of 1.5” of Open Grade Hot Mix Asphaltic Concrete with a PG 76-22 polymer and an asphalt finish course of 1.5” of FC 12.5 with PG 76- 22 polymer. - Traffic Level C, pursuant to the current FDOT Standard Specifications for Road and Bridge Construction, July 2021. The Contractor, at their discretion, may choose to use an asphalt finish course of 1.5” of FC 12.5 - Traffic Level C in all median cross overs and adjacent road turnouts within the project work area. Work includes, but is not limited to, exposing and cleaning edge of existing pavement, butt milling, paving, temporary and permanent pavement markings, redressing, installing bicycle markings and signage, installing new R.P.M.s, shoulder grading (Contractor is responsible for providing positive drainage away from the roadway surface), sodding, and other items. Project 3 - Resurfacing services for two lanes of S Canary Palm Ter from W Green Acres St to W Oaklawn St, approximately 1335 feet per lane (Attachment “A”). This includes milling of 1.5” then resurfacing with an asphalt finish course 1.5” thick, being FC 12.5 with PG 76-22 polymer binder - Traffic Level C, pursuant to the current FDOT Standard Specifications for Road and Bridge Construction, July 2021. Work includes, but is not limited to, exposing and cleaning edge of existing pavement, milling, paving, temporary and permanent pavement markings, redressing, installing new R.P.M.s, shoulder grading (Contractor is responsible for providing positive drainage away from the roadway surface), sodding, and other items.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents