Similar Projects
Marigold Avenue Roundabouts - Osceola County
Infrastructure
Conception
$5,000,000 est. value
Poinciana, FL 34758

The Works Business Resource Center
New Construction - 17,000 SF
Design
$9,000,000 est. value
Lakeland, FL 33801

Divine Care Learning Center
New Construction - 4,000 SF
Design
Haines City, FL 33844

Waste Water Treatment Facility Improvements - Phase 2
Renovation, Infrastructure
Bidding
$20,000,000 CJ est. value
Davenport, FL 33837

Design-Build - SR 35 (US 98) from North of West Socrum Loop Road to South of CR 54
Infrastructure
Bidding
$108,000,000 est. value
Lakeland, FL 33812

Demolition - 343 Canal Court
Demolition, Infrastructure
Sub-Bidding
$60,000 CJ est. value
Lake Wales, FL 33859

Lakeland Central Park - Building 200
New Construction - 705,421 SF
Post-Bid
Lakeland, FL

Construction Services for Project Improvements (Phase 2)
Post-Bid
Lakeland, FL

Avenue C, SW Complete Street Project
Results
$1,419,000 est. value
Winter Haven, FL 33880

Railroad Crossing Asphalt Repairs
Results
Less than $46,461 est. value
Frostproof, FL 33843

Lake Mirror Office Building
Build-Out - 2,885 SF
Construction
$300,000 est. value
Lakeland, FL 33801

Lake Mirror Office Tower - Lake Mirror
New Construction - 135,000 SF
Construction
$10,000,000 CJ est. value
Lakeland, FL 33801

Winter Haven Storage
New Construction - 21,116 SF
Pending Verification
Winter Haven, FL 33881

Publix Data Center
Renovation - 142,250 SF
Pending Verification
$40,000,000 est. value
Lakeland, FL 33801

AutoZone #2853 / Auburndale
New Construction, Infrastructure - 6,500 SF
Design
$1,500,000 CJ est. value
Auburndale, FL 33823

Last Updated 08/03/2022 06:34 PM
Project Title

Posner Business Center

Physical Address View project details and contacts
City, State (County) Davenport, FL 33837   (Polk County)
Category(s) Commercial, Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Office, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $5,650,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 27, this project is bidding again with updated plans. *The owner requests that all subcontractor / supplier inquiries be directed to the invited GC Bidders. *This project is being bid by invitation only. If you have been contacted by the owner to bid on this project as a general contractor, and would like to be listed below, please notify our editorial staff.

Details

72,212 SF - 1 Story Above Grade, 72,212 SF. Parking Space/Stalls, 135 Parking Spaces. Disturbed Acre, 1 Acre. 1 Story Above Grade, 8,024 SF.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents