Similar Projects
Design-Build for Stream Restoration Lick Run at Roanoke Regional Airport
Post-Bid
$681,937 est. value
Roanoke, VA 24011

Sandy Run Regional Park Shoreline Stabilization
Results
$25,000 est. value
Fairfax Station, VA

Border Road Drainage Improvements Phase 2B
Results
Chesapeake, VA

Original Building Demolition and Box Culvert Construction
Construction
$6,075,000 est. value
Arlington, VA 22201

Baltimore Harbor Maintenance Dredging - York Spit
Results
$10,000,000 to $25,000,000 est. value
VA

Storm Water Ditches at Riverheads Elementary School
Results
Staunton, VA 24401

Cape Charles Harbor Fixed Breakwater - Phase 1
Results
Cape Charles, VA 23310

Construction of Munden Point Park Shoreline Stabilization
Results
Virginia Beach, VA

Tusico Branch Stream Restoration
Results
Fairfax, VA

NASA Wallops Beach Renourishment (Backpassing)
Results
$10,000,000 to $25,000,000 est. value
Wallops Island, VA 23303

Ashville Park Drainage Improvements Phase I
Results
Virginia Beach, VA

Ditch Cleaning Services
Term Contract
Results

Reinforced Pre-Cast Concrete Pipe
Results
Midlothian, Richmond, VA 23224

Pipe Rehabilitation VDOT Culpeper District
Term Contract
Results

Piney Branch Stream Restoration - Construction
Results
Less than $1,600,000 est. value
Vienna, VA 22160

Last Updated 06/04/2021 12:10 PM
Project Title

Dry Run Bank Stabilization Project

Physical Address View project details and contacts
City, State (County) Covington, VA   (Alleghany County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project is generally described as the the restoration and stabilization of the streambanks of Dry Run including debris removal from the stream channel and streambank along approximately 2,330 linear feet, and bank armoring, with a combination of river rock from the stream channel and imported riprap, for specific sections.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents