Similar Projects
Cooling Circulation Pumps and Installation
Term Contract
Post-Bid
Hanover, NH 03755

Groundwater Level Monitoring Network Well Replacement Project
Infrastructure
Post-Bid
Colebrook, Concord, Franklin, NH

Submersible Sewage Pump
Results
Brentwood, NH 03833

Drilled Well and Pump
Results
Less than $29,325 est. value
Danville, NH 03819

Water Wells Inspection and Redevelopment
Infrastructure
Post-Bid
Jaffrey, NH

Drilled Well and Pump
Results
Less than $30,750 est. value
Greenland, NH 03840

Rotary Lobe Pumps
Infrastructure
Post-Bid
Franklin, NH 03235

Decommissioning of Three Drilled Wells and One Dug Well
Results
Less than $17,840 est. value
Chester, NH 03036

Dry Well Hoist Replacement
Results
$30,000 to $50,000 est. value
Nashua, NH 03060

Well 2R Control and Chemical Feed Building Project
Results
Conway, North Conway, NH 03860

Open Channel Wastewater Grinder
Results
Merrimack, NH

Portable Six Inch Diesel Pump
Results
Rochester, NH

Well 2 PFAS Treatment Facility
Results
Merrimack, NH

Generator Injection Pump Rebuild
Results
Brentwood, NH

Fire Department East Station Well
Infrastructure
Results
Alton, NH

Reported 04/16/2022 12:00 AM
Project Title

Well Cleaning

Physical Address View project details and contacts
City, State (County) Raymond, NH   (Rockingham County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Providing services for the cleaning and redevelopment of Well #3.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents