Similar Projects
Renovations to West Windsor-Plainsboro High School North
Renovation
Bidding
$2,000,000 est. value
NJ 08536

General Contractor
Post-Bid
$80,000 to $100,000 est. value
North Brunswick Township, NJ 08902

Construction Management Services 2020-21 School Year
Term Contract
Post-Bid
Woodbridge, NJ 07095

New Perth Amboy High School
- 576,000 SF
Results
$4,180,922 est. value
Perth Amboy, NJ

Additions and Renovations to Community Middle School
Renovation, Addition
Results
$29,900,000 est. value
Plainsboro, NJ 08536

Junior High School Project
Construction
Carteret, NJ 07008

Renovations to Three Perth Amboy Public Schools
Renovation
Construction
$1,719,000 est. value
Perth Amboy, NJ 08861

Stair Upgrades at Carteret High School, Carteret Middle School, Columbus Elementary School and Nathan Hale Elementary Schools
Post-Bid
Carteret, NJ 07008

Classroom Alterations and Auditorium Upgrades at Multiple Schools
Renovation
Results
$4,729,000 est. value
Piscataway, NJ 08854

Alterations Phase 2 at Linwood School
Renovation
Construction
North Brunswick Township, NJ 08902

District Wide Facilities ADA Improvements (Phase III)
Renovation
Post-Bid

Ceiling Renovations at Various Schools
Renovation
Results
Woodbridge, NJ 07095

Workshop Addition and Interior Alternations at East Brunswick Campus
Addition
Construction
East Brunswick, NJ 08816

Courtyard Renovations at Perth Amboy High School
Renovation
Results
Perth Amboy, NJ 08861

Exterior Alteration at Woodrow Wilson Modular Unit Cladding
Renovation
Results
Edison, NJ 08837

Last Updated 07/16/2021 12:32 PM
Project Title

Domestic Hot Water Replacement and Partial Sewer Line Replacement at Middlesex High School

Physical Address View project details and contacts
City, State (County) Middlesex, NJ 08846   (Middlesex County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

C008 General Construction; or C009 General Construction/Alterations and Additions, C030 Plumbing Additionally, C047 Electrical; The existing single large domestic hot water tank shall be replaced with a group of smaller tanks, to make future replacements with minimum disruption to school Operations. The multiple modular tanks will be piped in parallel on both the HHW and DHW sides, and the existing boiler room piping will be modified as necessary to accommodate the new tank configuration and locations. NOTE THE FOLLOWING, CRITICAL CHANGES FROM THE PREVIOUSLY ISSUED BID DOCUMENTS, PUBLISHED APRIL 15, 2021: 1.) THE EQUIPMENT AND PIPING CONFIGURATION / LOCATION, 2.) THE BASIS OF DESIGN PRODUCTS, 3.) TWO ADDITIONAL ALTERNATES. The District employed the services of an inspection agency to camera scope the existing sub-grade sewer lines. Multiple locations are compromised. As a result, sub-grade piping in the main #100 Hallway, in the #301-305 Hallway, and in the #99-104 Hallway shall be replaced.

Details

Middle/Senior High School, Renovation.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.
Division 26 - Electrical.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents