Similar Projects
Wet Well Cleaning Services
Term Contract
Post-Bid
Dover, NH

Drilled Well and Pump
Results
Less than $27,355 est. value
Chester, NH 03036

WTP Finish Pumps
Results
Brentwood, NH

Ossipee Mountains Estates Cooperative Water System Improvements
Construction
Ossipee, NH 03864

Campbell Well Cleaning and Pump Repairs
Results
Dover, NH

Drilled Well and Pump
Results
Less than $21,260 est. value
Hopkinton, NH 03229

Drilled Well and Pump
Results
Less than $22,235 est. value
Weare, NH 03281

Construction of Wells 7 and 8 PFAS Treatment Addition
Results
Less than $3,000,000 est. value
Merrimack, NH

Geothermal Well Pump
Results
Boscawen, NH

Deer Estates Cooperative Water System Upgrades
Results
Milan, NH 03588

Pump Station No. 2 Replacement
Results
Less than $1,200,000 est. value
Hanover, NH

Wet Well Cleaning Services
Results
Dover, NH

Submersible Sewage Pump
Results
Brentwood, NH 03833

Patterson DMC-3 Stage Fire Pump (Supply and Install)
Results
Tilton, NH 03276

Prospect Booster
Results
Lebanon, NH

Last Updated 07/23/2021 10:44 AM
Project Title

Madbury Wells 2, 3, 4, and 5 Upgrade

Physical Address View project details and contacts
City, State (County) Madbury, NH 03823   (Strafford County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of Wells #2, #3, #4, and #5 Upgrades at the Madbury Water Treatment Plant. The work will consist of HVAC upgrades at Wells 1, 2 and 3, removal of the pump at Well #4, and abandonment of Well #4, installation of well pumps and pitless adapters for Wells 4R and 5, an access road, water main and electrical service to Well 5, and a new precast concrete pump station for Wells 4R & 5.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents