Similar Projects
New Baseball Field for Miracle League-Mike Miller Park
New Construction
Post-Bid
$600,000 est. value
Benton, KY 42025

Glasgow Park Project
New Construction
Pending Verification
$15,000 est. value
Glasgow, KY 42141

Falling Springs Recreation Center Baseball Cages
Results
Versailles, KY

First Southern Veterans Park Baseball Concession Stand 2021
Renovation
Post-Bid
Stanford, KY

Cumberland Mint
New Construction
Pending Verification
Williamsburg, KY

Outdoor Pavilion
Renovation
Post-Bid
$700,000 est. value
Flemingsburg, KY 41041

Hurstbourne Commons
New Construction
Pending Verification
Louisville, KY 40291

Reported 09/03/2021 12:00 AM
Project Title

Farmers Market Canopy

Physical Address View project details and contacts
City, State (County) Winchester, KY   (Clark County)
Category(s) Entertainment/Recreation
Sub-Category(s) Misc. Recreational
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes the erection and assembly of a pre-engineered - fabricated canopy structure (24ft x 272ft), earthworks grading, concrete saw cutting, footer excavations, construction of concrete pier foundations, concrete slab/pavement, placement of approximately 30 feet of electric conduit, downspouts, downspout collector piping system, erosion control, seed/straw final stabilization.

Details

Misc. Recreational, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents