Similar Projects
The Approach at Ponte Vedra Beach
New Construction - 50,800 SF
Conception
Ponte Vedra, FL

St. Augustine Centre
New Construction - 99,500 SF
Conception
Saint Augustine, FL 32084

Durbin Creek Crossing - Master Plan
New Construction - 250,000 SF
Design
$10,000,000 CJ est. value
Saint Johns, FL 32259

ABC Fine Wine and Liquors #174
New Construction - 10,980 SF
Design
$1,372,500 est. value
Saint Johns, FL 32259

Tractor Supply #1240
Renovation - 22,589 SF
Bidding
Saint Augustine, FL 32086

Walmart 0-2--TENANTBID--2021 - Bundle #2
Renovation
Post-Bid

Vanilla Shell Modifications
Renovation
Post-Bid
Saint Augustine, FL

Nocatee Town Center - Shell D
New Construction - 9,615 SF
Construction
$1,000,000 est. value
Ponte Vedra, FL

Costco
New Construction - 156,911 SF
Construction
$13,515,781 est. value
Saint Augustine, FL

Parrish Farms - Master Plan
New Construction - 4,000,000 SF
Pending Verification
$10,000,000 CJ est. value
FL

Badcock Home Furniture
New Construction - 17,496 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Saint Johns, FL 32259

Daily's Gas Station and Boos Development
New Construction - 109,200 SF
Design
Saint Johns, FL

Sharkey's Cuts for Kids
Renovation - 1,050 SF
Post-Bid
Saint Johns, FL

Xfinity
Build-Out - 1,870 SF
Construction
$172,450 est. value
Saint Johns, FL

Beachwalk - Mixed Use
New Construction - 150,000 SF
Pending Verification
$10,000,000 CJ est. value
Saint Augustine, FL

Last Updated 01/11/2022 10:15 AM
Project Title

Durbin Pavilion - Shell

Physical Address View project details and contacts
City, State (County) Saint Johns, FL   (Saint Johns County)
Category(s) Commercial
Sub-Category(s) Retail
Contracting Method
Project Status Construction Commenced January 2022, Construction Completion Expected August 2022
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

3 Retail, 21,000 SF New Construction.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 11 - Equipment, Loading Dock Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents