Similar Projects
Des Moines River Basin, Saylorville Lake Roads, Trails and Infrastructure Maintenance IDIQ
Term Contract
Bidding
$10,000,000 to $25,000,000 est. value

2022 Seal Coat
Infrastructure
Bidding
$60,000 est. value
Cedar Falls, IA

FY 2022 Asphalt Overlay Program
Infrastructure
Post-Bid
Waterloo, IA

Strayer-Wood Theater Loop Drive and Pavement Repairs and Maintenance on Panther Parkway
Infrastructure
Post-Bid
$395,000 est. value
Cedar Falls, IA 50614

Rotary Reserve Access Lane and Parking Lot Resurfacing
Infrastructure
Results
Waterloo, IA

Cyber Lane Extension
Infrastructure
Results
Cedar Falls, IA

2021 Permeable Alley
Infrastructure
Results
$107,175 est. value
Cedar Falls, IA

2021 Seal Coat
Infrastructure
Results
$143,728 est. value
Cedar Falls, IA

2021 CFU Patching
Infrastructure
Results
$288,409 est. value
Cedar Falls, IA

HMA Resurfacing - I-380
Infrastructure
Results
IA

Deck Joint Repair
Infrastructure
Results
IA

HMA Resurfacing - Cold in Place Recycling
Infrastructure
Results
IA

HMA Joint and Crack Sealing
Infrastructure
Results

Greenhill Road & South Main Street Intersection Improvements
Infrastructure
Results
$3,347,400 est. value
Cedar Falls, IA 50613

HMA Resurfacing With Milling
Infrastructure
Results
IA

Last Updated 06/09/2022 02:30 AM
Project Title

UNI Institutional Roads 2022

Physical Address View project details and contacts
City, State (County) Cedar Falls, IA   (Black Hawk County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $395,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As part of the 2022-2026 Institutional Roads program, UNI will include reconstruction of Strayer-Wood Theater Loop Drive and pavement repairs and maintenance on Panther Parkway. The project shall also include new sidewalks at the SWT location that are not eligible for P & IR funding. Replacement of the water utility service to Strayer-Wood Theater shall also be included in this project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents