Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Training Building New 3-Bay Substation - Electrical Construction Work
Alteration
Bidding
$500,000 est. value
Central Islip, NY 11722

Byron Lake Pool Reconstruction - Electrical
Alteration
Bidding
$30,000 est. value
Oakdale, NY 11769

LED Price Signs Fabrication & Installation-NJ, NY & PA
Renovation
Post-Bid

Interior Lighting Upgrades at Central Administration Building
Alteration
Post-Bid
Dix Hills, NY 11746

North Sea Landfill Community Solar Development
Alteration
Results
Southampton, NY 11968

NEC Migration, Installation and Maintenance
Term Contract, Alteration
Results
NY

Our Lady of Consolation Generator Install
New Construction, Alteration
Construction
West Islip, NY 11795

Generator Services
Term Contract
Bidding
Southampton, NY

Huntington Town Hall Standby Generator
Alteration
Post-Bid
Huntington, NY

Emergency Generator, Buildings 45, 47 and 56
Alteration
Results
$500,000 to $1,000,000 est. value
Brentwood, NY 11717

2022-2023 Electrician Services Districtwide
Alteration
Bidding
Cutchogue, NY

Accabonac Solar Farm Pollinator Meadow
Infrastructure
Post-Bid
East Hampton, NY 11937

Accabonac Solar Farm Pollinator Meadow
Alteration
Results
East Hampton, NY

Emergency Generator Service
Term Contract
Bidding
Lake Ronkonkoma, NY

Reported 05/27/2022 12:00 AM
Project Title

Electrical Power Upgrade for New Laboratory Equipment

Physical Address View project details and contacts
City, State (County) Northport, NY 11768   (Suffolk County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $100,000 to $250,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project is to provide power supply to new laboratory equipment based on the electrical power study on existing electrical panelboards inside the Laboratory. The electrical power study for existing electrical system for this laboratory had been completed and report had been submitted and approved for this construction project. Scope of work includes but is not limited to the following: o Disconnect and remove existing panelboards 'CL1-D3' and 'CL1-D3B'. o Provide new 120/208V, 3 Phase, 4 Wire, 84 pole panelboards 'CL1-D4'. o Provide new receptacles and branch circuit wirings for new laboratory equipment. o Provide new branch circuit wiring to existing wiremold/receptacles fed from removing panelboard 'CL1-D3'. o All field work shall be performed on and off-hours without disturbing existing equipment in active 24/7 operation of the Lab. Lab operations are not to be interrupted during field work. o Contractor shall carefully coordinate with Laboratory Manager any scheduled/approved circuit outages in advance of any work that would affect Lab operations. o Provide all necessary tools, equipment, and Personal Protective Equipment (PPE) to perform the work safely, effectively, and timely. Tools, equipment, and PPE shall comply with the requirements of OSHA Standard 29 CFR 1910, Subpart I, VA Safety Requirement and NFPA 70E.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents