Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

Kiski Area Intermediate School Renovation
Renovation
Design
Vandergrift, PA 15690

SR 4019 over Brush Creek
Infrastructure, Renovation
Design
$1,767,495 CJ est. value
North Huntingdon, PA 15642

Fairwood Manor Bridge
Demolition, New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
Irwin, PA 15642

Fairwood Manor Bridge
Demolition, New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
Irwin, PA 15642

DNA Laboratory Facility New Building PA State Police Greensburg - Phase 1
New Construction, Infrastructure - 50,000 SF
Post-Bid
$30,000,000 CJ est. value
Greensburg, PA 15601

Contract #1 - Scottdale Borough 2022 Paving, Contract #2 - Tar and Chip Projects
Infrastructure
Post-Bid
$86,000 CJ est. value
Greensburg, PA 15601

SGL #042 Pipeline Road Maintenance
Infrastructure
Results
$609,489 CJ est. value
Fairfield Township, PA 15658

SGL #042 Pipeline Road Maintenance
Infrastructure
Results
$609,489 CJ est. value
Fairfield Township, PA 15658

Oakwood Manor Residential Development
New Construction, Infrastructure
Construction
$17,000,000 CJ est. value
Penn Township, PA 15632

Bushy Run Corporate Park Lot 21 / Penn Township
New Construction, Infrastructure - 30,000 SF
Pending Verification
$3,000,000 CJ est. value
Jeannette, PA 15644

ADA Walkways - Penn Township Municipal Park
Infrastructure
Pending Verification
$225,000 CJ est. value
Harrison City, PA 15636

SR 1020 over Branch of Saxman Run
Infrastructure, Renovation
Conception
$3,000,000 CJ est. value
New Kensington, PA 15068

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$1,961,171 CJ est. value
Franklin Township, PA 16001

Last Updated 02/16/2024 01:01 PM
Project Title

Hempfield Area School District: Alterations and Additions to Hempfield Area High School - Bid Event 1

Physical Address View project details and contacts
City, State (County) Greensburg, PA 15601   (Westmoreland County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $128,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 2024 all previous bids came in over budget. The scope of this project is being reviewed and will potentially be rebid in the future. Project Number 003032 The project is comprised of the following Prime Bid Contracts: Prime Contract 1 - General Construction (Areas D, E, G, H, J) Prime Contract 2 - Casework (Areas D, E, G, H) Prime Contract 3 - Swimming Pool & Associated Equipment (Area H) Prime Contract 4 - Fire Protection (Areas D, E, G, H) Prime Contract 5 - Plumbing Construction (Areas G & H) Prime Contract 6 - Electrical Construction (Areas G, H, Site Lighting, Site Service (see Matrix) The project consists in building a new Main Gymnasium and Natatorium addition in the north side of the building (areas G &H), central plant upgrades and renovations at locations in areas D & E. A second bid event will occur in the fall to complete renovations in the rest of the building. General Construction includes but is not limited to: All sitework including modifications to the existing parking lots and a new parking lot, temporary fencing and site controls, site utilities and landscaping. Temporary partitions, doors, and ramp, select building demolition, concrete masonry and steel work, waterproofing and air barriers and metal wall panels. Roofing and windows for the new additions are included in this contract. The roofing and exterior windows for the existing building will be part of a separate GESA contract. All doors, frames and hardware, Aluminum entrances, sunshades, curtain wall, borrowed lites and glazing, partitions, ceilings, wall and floor finishes, painting, all division 10 items, food service equipment in the concession area, tech ed and art equipment, athletic equipment, stage rigging and curtains, window treatments and elevators are included. Casework will include but not limited to all plastic laminate casework, millwork, science casework and equipment, tech ed casework, countertops, and braces. Swimming Pool Construction will include work as shown in the documents. Strong coordination with the GC, plumbing, mechanical and electrical contractor is required. Fire Protection renovations include a new back flow preventor and main serving the new additions. New fire protection shall be provided for the new additions G&H as well as piping and coverage to areas D&E of the renovated areas. Mains shall be capped for future connection for phase 2 of the project. Plumbing for the Additions areas G&H include providing bathroom fixtures (water closets, urinals, and lavatories) with low-flow fixtures; ADA upgrades, providing mixing valves, floor and roof drains, water hammer arrestors, domestic water heaters, domestic water pumps, sump pumps and duplex ejector pumps. Electrical Installation of new 2000A 277/480V Main Distribution Switchboard Sports Plex (MDSP). The existing site utility transformer will be removed and relocated. The feed to the existing Field House will be intercepted and extended to the new utility site transformer. New distribution panel feeders will be installed from MDSP. 480V-208/120V transformers will be installed between 480/277V distribution and panelboards to 208/120V panelboards. Power connection for HVAC and plumbing equipment. Including chiller, rooftop equipment, fan coil units, cabinet heaters, pumps, etc. connects will be provided with new conduit and cabling. Provide grounding system with proper building ground and service grounding. Tamper proof duplex and tamper proof ground fault circuit interrupter devices. Install devices for special equipment. Provide LED light fixtures throughout Areas G and H within scheduled bid event 1. Daylight harvesting and occupancy sensors will be installed. All areas will get new lighting controls and switching. Site lighting will have selected new site light bases, poles, and fixtures. There will be selected concrete bases to remain with new poles and fixtures. Public electrical contractor will only provide back boxes and conduit for fire alarm. GESA subcontractor will be installing all fire alarm cabling, sleeves, J hooks, fire caulking, devices, and testing. Provide boxes, tile/masonry rings, conduit fittings, conduit, conduit supports, and plastic bushing on conduit for fire alarm in areas of accessible ceilings. Provide box, conduit fittings, conduit supports, conduit, and plastic bushing on conduit to nearest accessible ceiling with coordination with GESA fire alarm provider in areas of exposed ceilings. Provide a new PA intercom speakers and clock. Headend equipment will be provided and installed by the GESA subcontractor. There will be new corridor clocks with new classroom clocks. Gymnasium and Natatorium will receive sound system. AV system will be provided with owner supplied interactive displays. Provide Communications equipment racks and patch panels. Horizontal cabling with supports. Provide fiber backbone cabling. Installation of jacks and plate covers. SiteloqIQ would like to invite you to participate in the bidding process for this construction project by utilizing our Construction Project Management Software, "Procore." Procore helps to streamline the bidding process by allowing bid invitees to download relevant bid documents and submit their bids electronically. In this system, all electronic correspondence is tracked and archived, and bidders are provided with the most up to date information available for the project. We feel that this tool will simplify the bidding process for your project team by cutting down on the amount of filing and paperwork that typically accompanies bid management. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. Submit all questions and requests for information in writing via email regarding the Drawings and Project Manual to the Architect and Construction Manager: Core Architects: Pete Szymanski at pszymanski@corepgh.com David Nitchkey at dnitchkey@corepgh.com SitelogIQ: Tim Werner at tim.werner@sitelogiq.com Jen Sariano at jennifer.sariano@sitelogiq.com Dewanna Laning at dewanna.laning@sitelogiq.com Questions will be accepted until end of day, Friday, July 14, 2023. All addenda, except addenda extending the bid deadline, will be issued no later than Monday, July 17, 2023. PLEASE NOTE: Alterations and Additions to Hempfield Area High School - Bid Event 1 is a HYBRID Project. There is a separate GESA Bidding Event running concurrently with the PRIME Bidding Event.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents