Similar Projects
Access Control Point Program Design Build II -- RFI(2)
Design

Access Control Point Program Design Build II -- RFI(2)
Design

Operation and Maintenance of Government-Owned Facilities and Equipment, Jim Woodruff Lock & Dam and Lake Seminole Project, Florida and Georgia
Bidding

Operation and Maintenance of Government-Owned Facilities and Equipment, Jim Woodruff Lock & Dam and Lake Seminole Project, Florida and Georgia
Bidding

Amendment 0003 - Design Build Contract for the General Construction Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple-Award Term Contract—with Design-Build Capabilities—for the State of Georgia
Post-Bid
$1,000,000 to $5,000,000 est. value

Amendment 0003 - Design Build Contract for the General Construction Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple-Award Term Contract—with Design-Build Capabilities—for the State of Georgia
Post-Bid
$1,000,000 to $5,000,000 est. value

Army Mechanical MATOC
Results
Less than $2,000,000 est. value

Army Mechanical MATOC
Results
Less than $2,000,000 est. value

IDIQ Job Order Contract, Fort Stewart and Hunter Army Airfield, GA
Design
Fort Stewart, Savannah, GA

Wills Park Maintenance Facility
Bidding
Alpharetta, GA 30009

General Construction to Support the 81st Regional Support Command throughout the South East
Post-Bid
$1,000,000 to $5,000,000 est. value
Orlando, Tampa, FL - Augusta, Fort Gordon, Macon, GA - Lexington, KY - Greenville, MS - Asheville, Brevard, Hickory, NC - Aiken, Columbia, Greenville, Greenwood, North Charleston, Orangeburg, Spartanburg, York, SC - Knoxville, Nashville, TN

Air Force Contract Augmentation Program (AFCAP) V
Results

Indefinite Delivery / Indefinite Quantity (IDIQ) Global Contingency Construction (GCC) Multiple Award Contract (MAC)
Design
Less than $5,000,000,000 est. value

Providence Park Improvements
New Construction - 635 SF
Bidding
Milton, GA 30009

Weatherization Contractors
Post-Bid

Last Updated 10/20/2020 10:52 AM
Project Title

Partition & Misc IDIQ 8(a) Competitive-Atl Regional & Metro, Macon & Savannah

Physical Address View project details and contacts
City, State (County) Atlanta, Macon, Savannah, GA 30303 (Bibb, Chatham, Fulton Counties)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Set Aside: Competitive 8(a): provide partitioning & miscellaneous construction services on an IDIQ (Indefinite Delivery/Indefinite Quantity) basis for repair and alteration projects at GSA owned and leased facilities throughout the state of Georgia with concentrations around the cities of Atlanta Central, Atlanta North, Macon and Savannah, GA: - Task order requirements may include but are not limited to: general construction, painting, carpeting, walls and framing, demolition, asbestos, carpentry, HVAC, electrical work, ceilings and plumbing.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Partitions.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents