Similar Projects
500 North - 700 East to 900 East - City of Provo
Infrastructure
Conception
Provo, UT 84601

500 North - Independence Avenue to 600 West - City of Provo
Alteration
Conception
$600,000 est. value
Provo, UT 84606

Eagle Mountain Medical Office Building
New Construction, Infrastructure - 11,434 SF
Design
$7,000,000 CJ est. value
Eagle Mountain, UT 84005

Metler Apartments
New Construction
Design
$9,000,000 est. value
Provo, UT 84604

East Bay Apartments
New Construction - 514,692 SF
Post-Bid
$10,000,000 CJ est. value
Provo, UT 84606

The Lofts At River's Edge
New Construction - 9,087 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Provo, UT 84604

Foothill Boulevard Extension - Lariat to Pony Express Parkway
Infrastructure
Results
$17,036,199 CJ est. value
Saratoga Springs, UT 84045

RFQ Contractor - 2021 UDOT Tie Fork Rest Area Landscaping Upgrades
Infrastructure
Results
$192,640 CJ est. value
Spanish Fork, UT 84660

Ridgeline Parkway Community
New Construction - 5,184,000 SF
Construction
$10,000,000 CJ est. value
Spanish Fork, UT 84663

Lehi Traverse Mountain Multifamily
New Construction - 284,960 SF
Construction
$10,000,000 CJ est. value
Lehi, UT 84043

East Center Street Townhomes
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Spanish Fork, UT 84660

43 North Apartments
New Construction
Pending Verification
American Fork, UT 84003

Center Street Arch - City of Provo
Infrastructure
Conception
$1,000,000 est. value
Provo, UT 84601

2022 Santaquin Center Street Storm Drain Improvements Project
Infrastructure
Design
$883,409 CJ est. value
Santaquin, UT 84655

Vineyard Tank Material Removal and Site Grading
Infrastructure, Alteration
Post-Bid
Vineyard, UT 84059

Last Updated 05/23/2023 01:11 PM
Project Title

Saratoga Dignity Care Assisted Living - Rebid

Physical Address View project details and contacts
City, State (County) Saratoga Springs, UT 84045   (Utah County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Assisted Living Facility, Site Development
Contracting Method Bids by Invitation
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $20,000,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

*As of August 29, 2022, all trades have been let. Rimrock is soliciting bids for (1) Saratoga Assisted Living facility and (19) Dignity Cottages. Please breakout pricing for the Assisted Living facility from the Cottages as shown on the bid cover sheet. Subcontractors are encouraged to provide numbers for both the Assisted Living and the Dignity Cottages but are welcome to bid on the Cottages only or the Assisted Living only. Construction start date will be August 2022 Project Duration: Approx. 14 months

Details

2 Stories Above Grade, 61,420 SF. New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents