Similar Projects
Resurfacing and Related Work on a Section of Route 44
Bidding
$2,088,665 est. value
Seekonk, MA

Resurfacing and Related Work on A Section of Route 28
Bidding
Less than $11,647,763 est. value
Cambridge, Somerset, MA

Phase II - Hedge Street Roadway Improvement
Post-Bid
Less than $370,518 est. value
Fairhaven, MA

Statewide Airport Pavement Maintenance Project
Post-Bid
Less than $1,500,000 est. value

Intersection Improvements and Related Work (including Signals) Fall River Avenue (Route 114A) at County Street
Results
Less than $1,554,000 est. value
Seekonk, MA

Resurfacing and Related Working (Including 9 Bridges) along a Section of Route 24 (Fall River Expressway)
Results
Less than $9,399,000 est. value
Fall River, MA 02721

CDA Streets Contract
Bidding
Fall River, MA

Statewide Pavement Maintenance and Pavement Markings at Various Public-Use Airports
Post-Bid
Less than $1,500,000 est. value
Wakefield, MA

Sidewalk and Roadway Improvements in the Town of Dartmouth Bliss Corner Area
Results
Less than $1,420,000 est. value
Dartmouth, MA

Highway Phase II
Bidding
Dartmouth, MA

Cold Planing and Bituminous Concrete Pavement Overlay
Term Contract
Post-Bid
Less than $600,000 est. value
Seekonk, MA 02771

Roadway Reconstruction and Related Work (Including Signals) along a Section of Kings Highway
Results
Less than $7,854,636 est. value
New Bedford, MA

Pavement Reclamation
Post-Bid
Less than $50,000 est. value
Seekonk, MA

Crack Sealing
Results
Less than $40,000 est. value
Acushnet, MA

On-Call Flooring Repair Services and Concrete/Asphalt Services
Term Contract
Post-Bid
Less than $25,000 est. value
Fall River, MA 02721

Last Updated 09/02/2020 10:33 AM
Project Title

Roadway Construction and Related Work (Including Signals) Along A Section of Broadway (Route 138)

Physical Address View project details and contacts
City, State (County) Taunton, MA 02718   (Bristol County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,714,331
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

"1.000","Ls","Schedule Of Operations - Fixed Price $43500","100." "100.000","Ft","Tree Trimming","102.1" "10.000","Ea","Tree Protection - Armoring & Pruning","102.511" "240.000","Ft","Tree And Plant Protection Fence","102.521" "5.000","Ea","Tree Removed - Diameter Under 24 Inches","103." "1.000","Ea","Tree Removed - Diameter 24 Inches And Over","104." "150.000","Ft","Cement Mortar For Patching","106.252" "11200.000","Cy","Unclassified Excavation","120.1" "2500.000","Cy","Reinforced Concrete Excavation","127.1" "8900.000","Ft","Track Excavation","129.5" "100.000","Cy","Test Pit For Exploration","141.1" "320.000","Cy","Class b Trench Excavation","142." "70.000","Cy","Class b Rock Excavation","144." "10.000","Ea","Drainage Structure Removed","146." "8000.000","Cy","Gravel Borrow","151." "50.000","Ton","Crushed Stone","156." "260.000","Sy","Crushed Stone With Weed Barrier","156.99" "28600.000","Sy","Fine Grading And Compacting - Subgrade Area","170." "1.000","Ls","Environmental Health And Safety Program","180.01" "200.000","Hr","Personal Protection Level c Upgrade","180.02" "200.000","Hr","Licensed Site Professional Services","180.03" "30.000","Ton","Disposal Of Unregulated Soil","181.11" "30.000","Ton","Disposal Of Regulated Soil - In-State Facility","181.12" "40.000","Ton","Disposal Of Regulated Soil - Out-Of-State Facility","181.13" "30.000","Ton","Disposal Of Hazardous Waste","181.14" "300.000","Ton","Disposal Of Treated Wood Products","184.1" "2.000","Ea","Monitoring Well Adjusted","192.4" "21.000","Ea","Catch Basin","201." "11.000","Ea","Catch Basin - Bradley Head","201.6" "18.000","Ea","Manhole","202." "2.000","Ea","Special Manhole - 5 Foot Diameter","203.05" "1.000","Ea","Gutter Inlet - Special","204.11" "34.000","Ea","Drainage Structure Adjusted","220." "20.000","Ft","Drainage Structure Rebuilt","220.2" "1.000","Ea","Drainage Structure Change In Type","220.3" "7.000","Ea","Drainage Structure Remodeled","220.5" "10.000","Ft","Sanitary Structure Rebuilt","220.6" "15.000","Ea","Sanitary Structure Adjusted","220.7" "37.000","Ea","Frame And Grate (Or Cover) Municipal Standard","222.3" "6.000","Ea","Frame And Grate (Or Cover) Removed And Stacked","223.1" "3.000","Ea","Frame And Grate (Or Cover) Removed And Discarded","223.2" "100.000","Cy","Removal Of Drainage Structure Sediment","227.3" "1500.000","Ft","Removal Of Drainage Pipe Sediment","227.31" "15.000","Sf","Masonry Plug","227.4" "1500.000","Ft","12 Inch Drainage Pipe - Option","234.12" "305.000","Ft","15 Inch Drainage Pipe - Option","234.15" "270.000","Ft","18 Inch Drainage Pipe - Option","234.18" "70.000","Ft","24 Inch Drainage Pipe - Option","234.24" "50.000","Ft","10 Inch Ductile Iron Pipe","238.10" "30.000","Ft","12 Inch Ductile Iron Pipe","238.12" "40.000","Ft","6 Inch Ductile Iron Water Pipe (Mechanical Joint)","303.06" "20.000","Ft","12 Inch Ductile Iron Water Pipe (Mechanical Joint)","303.12" "50.000","Ft","16 Inch Ductile Iron Water Pipe (Mechanical Joint)","303.16" "3000.000","Lb","Ductile Iron Fittings For Water Pipe","309." "20.000","Ft","12 Inch Water Main Removed And Stacked","315.12" "40.000","Ft","16 Inch Water Main Removed And Stacked","315.16" "100.000","Ft","1 Inch Plastic Water Pipe","336.1" "2.000","Ea","6 Inch Gate Box","357.06" "12.000","Ea","12 Inch Gate Box","357.12" "5.000","Ea","16 Inch Gate Box","357.16" "55.000","Ea","Gate Box Adjusted","358." "1.000","Ea","6 Inch Cast Iron Plug","367.06" "10.000","Ea","12 Inch Cast Iron Plug","367.12" "1.000","Ea","12 x 6 Inch Tapping Sleeve, Valve And Box","370.4" "1.000","Ea","Hydrant","376." "1.000","Ea","Hydrant - Removed And Reset","376.2" "5.000","Ea","Service Box","381." "70.000","Ea","Service Box Adjusted","381.3" "2300.000","Cy","Dense Graded Crushed Stone For Sub-Base","402." "2300.000","Sy","Pavement Fine Milling","415.2" "23000.000","Lb","Calcium Chloride For Roadway Dust Control","440." "140.000","Mgl","Water For Roadway Dust Control","443." "2400.000","Ton","Superpave Surface Course - 12.5 Polymer (Ssc - 12.5 - p)","450.231" "90.000","Ton","Superpave Intermediate Course - 12.5 (Sic -12.5)","450.31" "2700.000","Ton","Superpave Intermediate Course - 19.0 (Sic - 19.0)","450.32" "5500.000","Ton","Superpave Base Course - 37.5 (Sbc - 37.5)","450.42" "300.000","Ton","Hma For Patching","451." "2400.000","Gal","Asphalt Emulsion For Tack Coat","452." "14300.000","Ft","Hma Joint Sealant","453." "400.000","Ton","Temporary Asphalt Patching","472." "300.000","Sy","Stamped And Colored Concrete","476.12" "2300.000","Ft","Sawcutting Asphalt Pavement For Box Widening","482.5" "1800.000","Ft","Granite Curb Type Vb - Straight","506." "200.000","Ft","Granite Curb Type Vb - Curved","506.1" "1400.000","Ft","Granite Transition Curb For Wheelchair Ramps - Straight","509." "300.000","Ft","Granite Transition Curb For Wheelchair Ramps - Curved","509.1" "25.000","Ea","Granite Curb Inlet - Straight","514." "5.000","Ea","Granite Curb Inlet - Curved","515." "3300.000","Ft","Curb Removed And Reset","580." "220.000","Ft","Special Curb Removed And Reset","580.991" "500.000","Ft","Curb Removed And Stacked","590." "75.000","Ea","Curb Corner Removed And Stacked","592." "125.000","Ft","Edging Removed And Stacked","593." "1300.000","Ft","Curb Removed And Discarded","594." "40.000","Ft","Edging Removed And Discarded","597." "190.000","Ft","Ornamental Metal Fence","660.1" "5.000","Ea","Fence Post Removed And Reset","670.01" "190.000","Ft","Metal Fence Removed And Discarded","673.1" "30.000","Ea","Silt Sack","697.1" "4300.000","Sy","Cement Concrete Sidewalk","701." "1900.000","Sy","Cement Concrete Sidewalk At Driveways","701.1" "650.000","Sy","Cement Concrete Wheelchair Ramp","701.2" "190.000","Ton","Hot Mix Asphalt Sidewalk Or Driveway","702." "5.000","Ea","Concrete Wheel Stop Removed And Reset","703.2" "30.000","Ft","Stone Edging Removed And Reset","706.52" "13.000","Ea","Bound - Plain Granite","710.4" "26.000","Ea","Bound Removed And Reset","711." "1.000","Ea","Rural Mail Box Removed And Reset","715." "1.000","Ea","Sign Removed And Reset - Location No. 1","734.01" "37.000","Mo","Engineers Field Office And Equipment (Type a)","740." "1.000","Ls","Mobilization","748." "210.000","Cy","Loam Borrow","751." "1.000","Ls","Npdes Stormwater Pollution Prevention Plan","756." "1500.000","Sy","Seeding","765." "610.000","Ft","Sediment Control Barrier","767.121" "3.000","Ea","Maple - Red - 'October Glory' 2-2.5 Inch Caliper","776.543" "1050.000","Ft","3 Inch Electrical Conduit Type Nm - Plastic -(Ul)","804.3" "5.000","Ea","Electric Handhole - Sd2.023","811.23" "7.000","Ea","Pull Box 12 x 12 Inches - Sd2.031","811.31" "1.000","Ls","Traffic Signal Reconstruction Location No. 1","816.01" "1.000","Ls","Traffic Signal Reconstruction Location No. 2","816.02" "1.000","Ls","Traffic Control Signal Removed And Transported Location No. 1","816.901" "1.000","Ls","Traffic Control Signal Removed And Transported Location No. 2","816.902" "1.000","Ls","Traffic Control Signal Removed And Transported Location No. 3","816.903" "1.000","Ls","Rectangular Rapid Flashing Beacon (Solar), Location No. 1","824.221" "475.000","Sf","Warning-Regulatory And Route Marker - Alum. Panel (Type a)","832." "6.000","Ea","Flexible Delineator Post","834.201" "111.000","Ea","Sign Sup (n/Guide)+Rte Mkr w/1 Brkway Post Assembly - Steel","847.1" "1600.000","Hr","Roadway Flagger","850.41" "748.000","Day","Traffic Cones For Traffic Management","851.1" "1025.000","Sf","Safety Signing For Traffic Management","852." "400.000","Ft","Temporary Pedestrian Barricade","852.11" "4.000","Ea","Temporary Pedestrian Curb Ramp","852.12" "6.000","Ea","Portable Breakaway Barricade Type Iii","853.1" "20.000","Day","Temporary Illumination For Work Zone","853.8" "21000.000","Ft","Temporary Paving Markings - 6 Inch (Painted)","854.016" "3000.000","Ft","Temporary Paving Markings - 6 Inch (Tape)","854.036" "565.000","Day","Arrow Board","856." "300.000","Day","Portable Changeable Message Sign","856.12" "74800.000","Day","Reflectorized Drum","859." "400.000","Day","Reflectorized Drums With Sequential Flashing Warning Lights","859.1" "1200.000","Sf","Pavement Arrows And Legends Refl. White (Thermoplastic)","864.04" "17000.000","Ft","6 Inch Reflectorized White Line (Thermoplastic)","866.106" "6000.000","Ft","12 Inch Reflectorized White Line (Thermoplastic)","866.112" "7700.000","Ft","6 Inch Reflectorized Yellow Line (Thermoplastic)","867.106" "41.000","Ea","Street Name Sign","874." "5.000","Ea","Miscellaneous Signs Removed And Reset","874.45" "1.000","Ls","Miscellaneous Signs Removed And Discarded","874.51" "5.000","Ea","Automated Parking Pay Station","875.11" "20.000","Cy","3000 Psi, 1.5 Inch, 470 Cement Concrete","903."

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents