Similar Projects
Pressure Washing for Downtown Area 2021
Post-Bid
Fort Collins, CO 80524

Berthoud Trail Gap Project
Infrastructure
Post-Bid
Berthoud, CO

Copper Ridge Connector Trail
Results
Loveland, CO

Berthoud Safe Routes Sidewalk Project
Results
Berthoud, CO

Kinston Millennium East 14th Subdivision Public Infrastructure project
Infrastructure
Post-Bid
Loveland, CO

ADA Ramps Improvements
Results
Less than $1,000,000 est. value
CO

Kinston Millennium East 15th and 16th Subdivision
Infrastructure
Post-Bid
Loveland, CO

Parking Lot Repairs
Term Contract
Results
Fort Collins, CO

Safe Water Action Program General Contractor
Infrastructure
Post-Bid
Fort Collins, CO

TROC Trail Construction
Infrastructure
Results
Timnath, CO

Parking Lot Repair On-Call Services
Term Contract
Post-Bid
Fort Collins, CO

2021 Timnath General Trail Improvements - Wildwing Sidewalk
Infrastructure
Results
Timnath, CO

East Sheridan Residential Phase 2 Public Infrastructure Improvements
Infrastructure
Post-Bid
$460,000 est. value
Loveland, CO

2021 Sidewalk Connectivity Improvements, Package 2
Infrastructure
Results
Loveland, CO 80538

Municipal Building South Parking Lot Replacement
Infrastructure
Results
Loveland, CO

Reported 07/15/2022 12:00 AM
Project Title

Pickett East Parking Lot Improvements

Physical Address View project details and contacts
City, State (County) Fort Collins, CO 80521   (Larimer County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Request for Quotations, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Facilities Management at Colorado State University invites competitive documented quote responses to provide all labor, material, equipment to install structural rebar and pour back and finish new concrete per included drawings at the Pickett parking lot located in Fort Collins, CO. Please note that all demo work and surface prep completed by CSU.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents