Similar Projects
Last Updated | 08/22/2023 03:39 PM |
Project Title | NW 36th St Reconstruction-Irvinedale to Abilene - STR-18-003 - City of Ankeny |
Physical Address | View project details and contacts |
City, State (County) | Ankeny, IA 50023 (Polk County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Storm/Sewers |
Contracting Method | Competitive Bids |
Project Status | Conceptual Design, Construction start expected March 2026 |
Bids Due | View project details and contacts |
Estimated Value | $4,850,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The reconstruction of NW 36th Street, an existing two-lane rural roadway, from NW Irvinedale Drive to NW Abilene Road. The project includes the removal of the existing asphalt roadway and construction of a two-lane PCC urban street that will serve as the eastbound lanes when this future four-lane divided street is constructed. Storm sewer improvements to accommodate the future four-lane divided street are also included. Sanitary sewer and water main are assumed to be constructed with pending future development along the corridor in advance of the roadway reconstruction. Also included in this project is the reconstruction and traffic signalization of the NW 36th Street and NW Irvinedale Drive intersection as well as adding turn lanes to the north, south and west legs of the intersection. The east leg of the intersection will be widened to set up the future four-lane divided street with a left turn lane. Also included in this project is the addition of left turn lanes to the west and east legs of the NW 36th Street and NW Abilene Road intersection to provide better traffic flow for Rock Creek Elementary. It is anticipated that traffic volumes will drive the need to reconstruct NW 36th Street from NW Irvinedale Drive to NW Abilene Road within the next five years. This segment of NW 36th Street received an asphalt overlay in 2015; however, traffic is expected to continue to increase due to Rock Creek Elementary and adjacent current and future development, which will likely advance the deterioration of the existing asphalt rural roadway. Survey and conceptual design are planned for 2024, preliminary and final design along with right-of-way acquisition are planned for 2025, and construction is planned for 2026, with landscaping planned for 2027. The project is included in the city's 2022-2026 Capital Improvement Program (CIP). As of December 12, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. As of August 22, 2023, no new information available |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |