Similar Projects
South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Asphalt and Sidewalk Rehabilitation
Infrastructure
Results

Asphalt and Sidewalk Rehabilitation
Infrastructure
Results

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Full Circle Dairy Renewable Natural Gas Facility
New Construction, Infrastructure
Pending Verification
$22,000,000 CJ est. value
Lee, FL 32059

Full Circle Dairy Renewable Natural Gas Facility
New Construction, Infrastructure
Pending Verification
$22,000,000 CJ est. value
Lee, FL 32059

SR 25 (US 41 / US 441) from I-75 (SR 93) to CR 252
Infrastructure
Post-Bid
$9,805,526 est. value

Silicone Joint Sealer
Infrastructure
Results

SR 10 (US 90) from East of Greenville to Madison
Infrastructure
Post-Bid
$8,170,420 est. value
Greenville, FL 32331

District Two Bridge Tending Services
Infrastructure
Results

North Florida Medical Center - Madison
New Construction, Infrastructure - 11,411 SF
Post-Bid
$5,000,000 CJ est. value
Madison, FL 32340

NE CR 255 Roadway and Safety Improvements
Infrastructure
Results
Madison, FL

Last Updated 07/12/2023 03:10 PM
Project Title

SW Sampala Lake RD TO SR 53

Physical Address View project details and contacts
City, State (County) Madison, FL 32340   (Madison County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $4,420,617 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 12,2023, project was awarded to Anderson Columbia, CO, awarded amount is $4,420,616.71. Counties: Madison Road Name: SR 14 Limits: From Sw Sampala Lake Rd to Sr 53 Project(s): 44707815201(*) Federal Aid No: D221103B Total Roadway Length: 4.000 Miles Contract Days: 150 Total Bridge Length: 0.047 Miles Total Proposal Length: 4.047 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 120 Days The improvements under this contract consist of milling and resurfacing, widening, shoulder treatment, guardrail, sidewalk, drainage improvements, traffic signals, highway signing and other incidental construction on SR 14 from SW Sampala Lake Road to SR 53 in Madison County. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 008 Resurfacing - SR 14

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents