Similar Projects
PA 756 - Alvin St to Industrial Park Rd
Infrastructure
Conception
$8,726,367 CJ est. value
Richland, PA 15904

PA 756 - Alvin St to Industrial Park Rd
Infrastructure
Conception
$8,726,367 CJ est. value
Richland, PA 15904

Dutch Road Bridge Replace
Infrastructure, Renovation
Design
$1,551,579 CJ est. value
Loretto, PA 15940

Dutch Road Bridge Replace
Infrastructure, Renovation
Design
$1,551,579 CJ est. value
Loretto, PA 15940

Milling of Bituminous Pavement
Post-Bid
Johnstown, PA 15902

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

World-Wide Water Storage Tank Remediation
Term Contract
Results

Demolition, Site Clearance and Site Restoration
Demolition
Results
Franklin, Hastings, Johnstown, PA

Double Sealcoat With RS-2PM (E-2M) / CRS -2PM ( E-3M)
Infrastructure
Construction
$69,845 CJ est. value
Johnstown, PA 15901

Double Sealcoat With RS-2PM (E-2M) / CRS -2PM ( E-3M)
Infrastructure
Construction
$69,845 CJ est. value
Johnstown, PA 15901

PA 756 - PA 160 to Industrial Park Rd
Infrastructure
Conception
$2,846,627 CJ est. value
Adams Township, PA 15934

Summerhill PA 53 Laurel Run
Infrastructure
Design
$1,193,798 CJ est. value
Summerhill, PA 15958

Water System Maintenance/Repair Contract
Infrastructure
Post-Bid
Johnstown, PA

Phase 3 Site Improvements
Results
Cresson, PA

Sidman PA 160 Super Repl 2
Infrastructure
Conception
$2,387,189 CJ est. value
Croyle Township, PA 15958

Last Updated 10/11/2022 11:09 AM
Project Title

1889 Dam Trail Project

Physical Address View project details and contacts
City, State (County) South Fork, PA 15956   (Cambria County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $142,160 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located in South Fork, Cambria County, Pennsylvania. Contract Description: Contract No. 2022-02 consists of construction of the Path of the Flood Trail near the 1889 Dam. Work consists of the installation of a 10' wide gravel trail, including furnishing and installing fill material, rough grading earthwork, storm pipe, erosion and sedimentation controls, and restoration work. Work under this contract shall include all materials, equipment, supplies, and labor for the construction as shown and specified in the Contract Documents. The engineers estimate for the base bid is $100,000 and $11,000 for the alternate bid. The project is located in South Fork, Cambria County, Pennsylvania. Clarification Deadline: 7/6/2022 4:00 PM The project is being financed by a grant from the Commonwealth of Pennsylvania, Department of Community and Economic Development. The obligations imposed on the Owner by the financing agency(s) shall apply to and be acceptable to the successful bidder(s). Bidders must comply with all State anti-bid-rigging regulations pertaining to work associated with this project and will be required to submit an executed non-collusion affidavit with the bid. Bid security shall be furnished in accordance with the Instructions to Bidders. Prior to the award of the contract, the successful bidder shall furnish a satisfactory Performance Bond and a Labor and Material Payment Bond to the Owner, in the form contained in the Contract Documents and executed by a satisfactory circular 570 listed surety, each equal to 100% of the total contract amount. The bidder will also furnish evidence of insurance coverage as required by the contract documents. Bidders for this contract shall have completed projects similar in character and scope and will be required to provide with their bid a completed Statement of Bidders Qualifications and Equipment List in the forms prescribed in the Contract Documents. The Contractor shall adhere to the provisions of the Pennsylvania Prevailing Wage Rates as set forth in the Contract Documents. The Contractor shall also comply with the provisions of the Act of March 3, 1978 (P.L. 6, No. 3 known as the "Steel Procurement Act"). The successful bidder(s) will be required to complete all work by November 18, 2022 as will be indicated by the Owner in their written Notice to Proceed. The Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner also reserves the right to waive all minor informalities not involving price, time, or changes in the Work.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents