Similar Projects
Last Updated | 03/26/2021 06:14 PM |
Project Title | Central Business District Phase IV |
Physical Address | View project details and contacts |
City, State (County) | El Paso, TX 79821 (El Paso County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction, Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $13,500,000 to $14,500,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Campbell Street Limits: Paisano Dr. to Border HWY (SL 375) Roadway Improvements: The work consists of, but not limited to, the removal and off-site disposal of concrete curb and gutter, asphaltic concrete pavement, concrete bus pads, site clearing and grading, and preparation of roadway subgrade within the existing Right-of-Way limits. Construction of subgrade, flexible base course, rigid concrete pavement structure, concrete curb and gutter, concrete bus pads, traffic signals, multi-modal traffic striping, Storm Water Pollution Prevention, and traffic control for construction activities. Parkway Improvement: The work consists of the removal and off-site disposal of concrete sidewalks, concrete curb ramps, concrete driveways, adjust roof drains, adjust parking meter poles, and miscellaneous concrete removal within the existing Right-of-Way limits. Construction of concrete sidewalks, hardscaped parkways (no color), concrete driveways, concrete stem walls, concrete curb ramps, raised cycle track, irrigation system, landscaping, illumination, multi-modal traffic signage, Storm Water Pollution Prevention, and traffic control for construction activities. Kansas Street Limits: Father Rahm Ave. to Border HWY (SL 375) Roadway Improvements: The work consists of, but not limited to, the removal and off-site disposal of concrete curb and gutter, asphaltic concrete pavement, concrete bus pads, site clearing and grading, and preparation of roadway subgrade within the existing Right-of-Way limits. Construction of subgrade, flexible base course, rigid concrete pavement structure, concrete curb and gutter, concrete bus pads, multi-modal traffic striping, traffic signals, Storm Water Pollution Prevention, and traffic control for construction activities. Parkway Improvements: The work consists of the removal and off-site disposal of concrete sidewalks, concrete curb ramps, concrete driveways, adjust roof drains, adjust parking meter poles, and miscellaneous concrete removal within the existing Right-of-Way limits. Construction of concrete sidewalks, hardscaped parkways (no color), concrete driveways, concrete stem walls, concrete curb ramps, irrigation system, landscaping, illumination, multi-modal traffic signage, Storm Water Pollution Prevention, and traffic control for construction activities. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |