Similar Projects
PWC - Sky Valley Switching Station Site Construction
New Construction
Bidding
$2,700,000 est. value
Monroe, WA 98272

2021 North Bonneville Substation Project
New Construction
Post-Bid
Carson, WA

Electrical Power Distribution Transformers
New Construction
Post-Bid
Ellensburg, WA

Franklin Substation Refurbishment Project - Phase 1
Renovation
Results
$1,500,000 est. value
Pasco, WA

Denny Substation Youthcare TI
Renovation
Results
$972,000 est. value
Seattle, WA 98109

Chief Joseph Dam 480V Station Service Upgrade
Renovation
Post-Bid
$5,000,000 to $10,000,000 est. value
Bridgeport, WA

Tubular Steel Structures for Urban Industrial Substation
New Construction
Results
East Wenatchee, WA 98802

Substation Transformers Solicitation
New Construction
Post-Bid

Construct Urban Industrial Substation
Renovation
Results
East Wenatchee, WA

Bettas Road Substation
New Construction
Post-Bid
WA

13.8Kv Metal-Clad Switchgear Edgecomb Substation
New Construction
Results
WA

Last Updated 05/18/2022 03:35 PM
Project Title

Forks Substation Construction

Physical Address View project details and contacts
City, State (County) Forks, Sequim, WA 98331   (Clallam County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Electric Substation
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $547,080
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and new construction of a power facility in Forks, Washington. Completed plans call for the construction of a power facility; and for site work for a power facility. Prequalified contractors are invited to submit a sealed bid for Clallam County PUD No. 1, Forks Substation Construction located at 441 West E Street, Forks, WA. The scope of work consists of installing civil infrastructure, including material acquisition, grading and excavation, foundation, footing and other concrete work, ground grid addition, conduit installation, equipment installation, and other related work to provide a complete substation improvement. No outages are required or will be allowed for the completion of this contract. Work will be performed adjacent to the Forks 2 Substation (69kV/25kV) equipment energized. Successful bidder shall provide a construction barrier fence meeting both NESC and NEC requirements between the construction site and the energized portion of the substation. The District shall provide limited materials and electrical equipment, as detailed in the specifications and drawings. All other material, as detailed in the specifications and drawings, shall be the responsibility of the successful bidder. Each bid must be accompanied by a Bid Bond, Certified Check, or Cashiers Check in an amount equal to five percent (5%) of the Bid. All bidders must be prequalified in accordance with Washington State Regulations (RCW 54.04.085) prior to receiving bid proposals .

Details

Electric Substation, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Substations, Power Distribution Units, Transfer Switches.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents