Similar Projects
Roadside Mowing and Litter Pickup Services
Term Contract
Sub-Bidding
Lansing, MI 48933

PARCS Signage and Decals
Infrastructure
Sub-Bidding
$700,000 CJ est. value
Traverse City, MI 49684

Building Envelope Repair
Post-Bid
Ypsilanti, MI 48197

GRCC ATC Piazza Stair and Ramp Addition
Infrastructure, Alteration
Post-Bid
Grand Rapids, MI 49503

Classroom Lockers
Alteration
Results
Center Line, MI

Caulking at Richmond High School
Alteration
Results
Richmond, MI 48062

Abatement Services at 23158 Van Dyke Avenue
Term Contract
Sub-Bidding
Warren, MI 48089

Installation of Half Round Aluminum Gutters on Historic Properties
Alteration
Post-Bid
Livonia, MI 48152

Alpena Airport Procurement Sunshades Building 1640
Alteration
Results
Alpena, MI

Otsego County Bus Garage Repairs
Renovation
Sub-Bidding
$150,000 CJ est. value
Gaylord, MI 49735

Replace Pillars on the House at the Murphy Museum
Alteration
Post-Bid
Harbor Beach, MI

Exterior Housing Renovations
Alteration
Results

2023 Neighborhood Enhancement Program (NEP) Michigan State Housing Development Authority (MSHDA) Grant Project
Renovation
Sub-Bidding
$300,000 CJ est. value
Owosso, MI 48867

Repair Porches on the House at the Murphy Museum
Alteration
Post-Bid
Harbor Beach, MI

West Side Stair Entry and Canopy Improvements
Alteration
Results
Ann Arbor, MI 48109

Last Updated 06/22/2023 03:11 PM
Project Title

Frankenmuth High School Athletic Additions

Physical Address View project details and contacts
City, State (County) Frankenmuth, MI 48734   (Saginaw County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of a 4,250 square foot, locker room and toilet rooms addition at the southeast corner of the existing gymnasium building. The structure is load bearing masonry walls with a steel framed roof structure Expected construction completion date of August 2024 The project consists of a 770 square foot, entrance vestibule and storage room addition at the east end of the existing building, north of the gym. The structure is load bearing masonry walls with a steel framed roof structure and a Steel tube curved roof structure. Construction to begin once Phase 1 is completed.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents