Similar Projects
Fuzzy's Taco Shop
Build-Out
Conception
Anna, TX

Starbucks - Tenant Improvement
Build-Out - 2,092 SF
Conception
Celina, TX 75009

Chick-fil-A
Renovation - 4,200 SF
Design
$400,000 est. value
Plano, TX 75093

Starbucks
Build-Out - 2,058 SF
Design
$280,000 est. value
McKinney, TX 75070

Wraparound Services Center
New Construction, Infrastructure - 11,000 SF
Bidding
$4,600,000 CJ est. value
Dallas, TX 75252

Mckinney Municipal Complex
New Construction, Infrastructure - 173,000 SF
Post-Bid
$95,000,000 CJ est. value
McKinney, TX 75069

Arby's
New Construction - 2,332 SF
Post-Bid
$450,000 est. value
McKinney, TX 75070

Trinity Forest Spine Trail Phase 1 - Site Development
Results
Dallas, TX

Alley Reconstruction Group 17-1203
Results
$2,420,230 est. value
Dallas, TX 75248

West Grove
New Construction - 393,300 SF
Construction
$10,000,000 CJ est. value
McKinney, TX 75078

Braum's
New Construction - 4,900 SF
Construction
$900,000 est. value
McKinney, TX 75071

Wendy's #10650 / McKinney
Renovation - 3,038 SF
Pending Verification
$200,000 CJ est. value
McKinney, TX 75070

Lone Star Medical Center - Building Two
New Construction, Infrastructure - 15,430 SF
Pending Verification
$2,000,000 CJ est. value
Allen, TX 75013

The Rail District Development
New Construction - 37,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Frisco, TX

Hawaiian Bros.
Renovation - 4,000 SF
Post-Bid
Murphy, TX 75094

Last Updated 11/03/2022 12:01 PM
Project Title

Starbucks - Renner & PGBT

Physical Address View project details and contacts
City, State (County) Plano, TX 75074   (Collin County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected March 2022
Bids Due View project details and contacts
Estimated Value $735,140 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

New construction of a tenant space for Starbucks Coffee in an existing shell building. Work shall include interior partitions, interior finishes, equipment, lighting, HVAC, and drive-thru equipment. As of November 3, 2022, this project is under construction. The architect has been named, but a contractor has not. There is no firm timeline for construction completion. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

2,063 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents