Similar Projects
West Washington Street Redevelopment
New Construction
Conception
Ann Arbor, MI 48103

A2 North Maple
New Construction - 1,800 SF
Conception
Ann Arbor, MI 48103

Brightdawn Village Condominiums
New Construction - 956,000 SF
Design
$32,000,000 est. value
Ann Arbor, MI 48104

Ellsworth Independent Senior Living
New Construction, Demolition - 168,130 SF
Design
Ann Arbor, MI 48108

Sam's Club #6667-601 - CAPXHVAC-1
Renovation
Post-Bid
Ypsilanti, MI 48197

Walmart Supercenter #5472-604 - CAPXSUS-RWH
Renovation
Post-Bid
Saline, MI

Hickory Way Apartments
New Construction - 196,462 SF
Construction
$10,000,000 est. value
Ann Arbor, MI 48103

North Ashley Street Condominiums
New Construction - 39,080 SF
Construction
Ann Arbor, MI 48103

The Canopy
New Construction
Pending Verification
Ann Arbor, MI 48108

Liberty Cannabis - Marijuana Consumption Facility
Renovation - 1,321 SF
Pending Verification
Ann Arbor, MI 48104

The Grove at Veridian
New Construction
Design
Ann Arbor, MI 48104

Torrid # 5761-C
Renovation - 4,552 SF
Post-Bid
Ann Arbor, MI 48108

The Standard at Ann Arbor
New Construction - 213,366 SF
Construction
$40,000,000 est. value
Ann Arbor, MI 48104

Recreational Marijuana Retailer
Renovation
Pending Verification
Ypsilanti, MI 48197

Veridian at County Farm - South Site
New Construction, Renovation - 6,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Ann Arbor, MI 48104

Reported 01/03/2022 04:35 PM
Project Title

Vic Village South

Physical Address View project details and contacts
City, State (County) Ann Arbor, MI 48104   (Washtenaw County)
Category(s) Commercial, Residential
Sub-Category(s) Apartments/Condominiums, Retail
Contracting Method
Project Status Permitting, Sitework Start Expected January 2022, Construction Start Expected May 2022, Construction Completion Expected June 2024
Bids Due View project details and contacts
Estimated Value $30,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Retail, Apartments/Condominiums, 6 Stories Above Grade, 100,130 SF New Construction, 37 Unit(s).
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment, Residential Equipment, Residential Appliances.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents