Similar Projects
County Tennis Courts Demolition and Reconstruction
Renovation, Demolition
Bidding
$200,000 est. value
VA

Plaza Bethune Pump Station No. 519 Replacement and Force Main Rehabilitation
Post-Bid
Less than $1,773,150 est. value
Virginia Beach, VA 23456

SubT Demolition & Removal
Post-Bid
VA 22427

Livestock and Poultry Research Facility - Phase 1 - Bid Package 3
New Construction - 23,400 SF
Results
Blacksburg, VA 24061

Construction of Lake Front Village Pump Station 309 Replacement
Results
Less than $951,938 est. value
Virginia Beach, VA 23456

Pump Station 23 Service Area Phase 8
Construction
Less than $4,500,000 est. value
Norfolk, VA

Langley School Pump Station and Force Main
Construction
$3,400,000 est. value
McLean, VA 22101

Design Build Services of Ivy Creek Interceptor Division 5 and 6 and Route 460 Pump Station
Post-Bid
Roanoke, VA

Aquia WWTF MCC-1 Demo and Removal
Results
VA

Pump Station Communications Upgrade Project
Post-Bid
Portsmouth, VA

Demolition of Elliott Building
Results
Abingdon, VA 24210

Combined 7 Building Demos
Demolition
Post-Bid
Newport News, VA 23604

Park View Water Tank Demolition and Removal
Results
Harrisonburg, VA 22802

Demo Center Wall & Install Center Beam With Support
Term Contract
Post-Bid
$30,000 est. value
Portsmouth, VA 23703

Mayfield and Chickahominy Sewage Pumping Station Upgrades
New Construction
Results
Richmond, VA 23230

Last Updated 06/02/2022 11:09 PM
Project Title

Park Avenue Pump Station Replaceemnt (VP018000: C-515663)

Physical Address View project details and contacts
City, State (County) Chesapeake, VA 23324   (Chesapeake City County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Demolition, Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $13,232,996 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a replacement pump station, force main tie-in, appurtenances, and the demolition of the existing Park Avenue Pump Station

Details

Lift and Pump Stations, Renovation.
Division 01 - General Requirements.
Division 02 - Existing Conditions, Demolition.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents