Mixed Use Development
New Construction - 156,800 SF
Design
$10,000,000 CJ est. value
Noblesville, IN 46060

Training Academy - Bid Package 1 Sitework
Infrastructure
Bidding
$1,200,000 to $1,700,000 est. value
Indianapolis, IN 46235

Family Dollar
Demolition
Bidding
Morocco, IN 47963

Lower Cascades Green Yard Waste
Post-Bid
Bloomington, IN 47402

Homestead High School - Phase 1 Site Development
Post-Bid
Fort Wayne, IN 46814

Phase 2 Geotechnical Ground Improvement
Results
Saint John, IN 46373

2020 Street Resurfacing
Renovation
Results
Lewisville, IN 47352

NFPA Approved 1500 GPM Fire Well
Post-Bid
Granger, IN 46530

Gas City Auditorium Site Package
Results
Gas City, IN 46933

Burger King Curb In Pad Ready Site
New Construction, Demolition
Post-Bid
Georgetown, IN 47122

Erie Avenue Property Redevelopment RFP
Results
Hammond, IN 46320

Select Demolition Work and Site Excavation and Utility Work
Post-Bid
Noblesville, IN 46060

Community Pool Site Improvements
Results
Less than $436,792 est. value
Hobart, IN 46432

Decatur Central High School Retention Pond
Post-Bid
Indianapolis, IN 46221

Mine Reclamation - AML Site 898 - Enos Wetland
Results
Less than $150,000 est. value
IN

Last Updated 08/11/2021 11:41 AM
Project Title

Greenfield Wastewater Utility - Excavation, Disposal and Regrading Improvements

Physical Address View project details and contacts
City, State (County) Greenfield, IN   (Hancock County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of constructing the following:The project includes but is not limited to the excavation, removal, off-site disposal, and on-site stockpiling of approximately 80,000 cubic yards of urban/ construction debris intermixed within the soil structure variable in type, quantity, and size of debris. The project will occur at the City’s construction debris dump site located south of the existing waste- water treatment plant (WWTP). A Geotechnical Study, Environmental Review and Geophysics Investigation, and a Soil, Groundwater, Waste Management Plan (w/Addendum) have been performed / assembled /approved and are provided in the project specifications. The majority of the excavated material is anticipated to be construction debris and will be hauled off-site for disposal at the local CGS landfill. Some of the excavated material will be soil, which will be stockpiled on-site and addressed as part of the City’s WWTP Improvements Project (which is anticipated to bid and be initi- ated shortly after the successful outcome of this excavation project). Sheeting will be required to be installed to protect a roadway, influent interceptor sewer, water main, and maintenance building. A new aggregate surfaced road is required to be installed on-site for purposes of performing the work while maintaining unfettered access to the WWTP by Owner. The majority of the excavation will occur to the approximate maximum groundwater elevation identified in the Geotechnical Study. Excavation seepage, runoff, etc. will be required to be retained and processed through the City’s WWTP by Contractor. PPE level D is anticipated.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents