Similar Projects
Oconomowoc - Mayville Const / Mill and Overlay
Infrastructure
Conception
$4,000,000 CJ est. value
Iron Ridge, WI 53035

Columbus - Watertown Const / Concrete Overlay
Infrastructure
Conception
$2,000,000 CJ est. value
Reeseville, WI 53579

Bridgeport - Boscobel Const / Sanitary Water / MISC
Infrastructure
Design
$2,000,000 CJ est. value
Juneau, WI 53039

Bridgeport - Boscobel Const / Sanitary Water / MISC
Infrastructure
Design
$2,000,000 CJ est. value
Juneau, WI 53039

2022 Bridge Street Reconstruction
Infrastructure
Post-Bid
Mayville, WI

2022 Dodge County HMA Paving Contract
Infrastructure
Post-Bid
$510,000 CJ est. value
Juneau, WI 53039

East Avenue Reconstruction
Infrastructure
Results
Iron Ridge, WI 53035

2022 Private Sewer & Water Service Replacement Program
Infrastructure
Results
Beaver Dam, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Oconomowoc - Mayville RR OPS / Crossing Repair / Resurface
Infrastructure
Design
$250,000 CJ est. value
Iron Ridge, WI 53035

Mayville Public Library - Furniture, Audio Visual Systems, Signage, Appliances and Relocation Services Package
New Construction, Infrastructure
Post-Bid
$8,500,000 CJ est. value
Mayville, WI 53050

Cedar Street and Mill Street Reconstruction
Infrastructure
Results
Horicon, WI 53032

Cityview 2nd Addition - Phase 1
Infrastructure
Construction
$1,754,071 CJ est. value
Horicon, WI 53032

Watershed Project
Infrastructure
Design
$500,000 CJ est. value
Westford, WI 53916

Last Updated 07/24/2023 12:08 PM
Project Title

Cooling Tower Pipe Replacement

Physical Address View project details and contacts
City, State (County) Waupun, WI 53963   (Dodge County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $248,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the work consists of: removal of existing steel pipes from cooling tower to chiller and replacement with stainless steel pipes. Replace existing condenser water pump impeller with stainless steel impeller in pump housing. Install new valves, sensors, gauges, strainers, and other piping accessories in the new piping in the same location as existing

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents