Similar Projects
Corrugated Metal Pipe (CMP) Lining 2020
Bidding
Newark, DE 19711

Marine Operations Building – Floodwall Project
Post-Bid
Lewes, DE 19958

Delaware Coast, Bethany Beach to South Bethany, Delaware Sussex County, DE
Post-Bid
$5,000,000 to $10,000,000 est. value
Bethany Beach, DE

Shallcross Avenue Sewer Separation
Results
Wilmington, DE 19801

BR 3-935 on S211 Mccoy Street over Herring Branch
Results
$498,362 est. value
DE

The Mill Race Drainage Improvements
Results
Rockland, DE

Cleaning of Feeder Ditches at the Southern Solid Waste Management Center
Results
Georgetown, DE 19947

BR 3-588 on SR26 Nine Foot Road over Wharton'S Branch
Results
$888,940 est. value
DE

Clearing, Grubbing and Fencing at the Central Solid Waste Management Center
Results
Felton, DE 19943

Reinforced Concrete Pipe
Term Contract
Results

Elsmere -1201 Sycamore Avenue Drainage Improvement
Results
Less than $234,150 est. value
Elsmere, DE 19805

Beachfill-Rohoboth DE
Results
Less than $10,000,000 est. value
Rehoboth, DE 19971

Simonds Gardens Storm Sewer Replacement
Results
Newark, DE 19702

Simonds Gardens Site Drainage Improvements
Results
Newark, DE 19702

Structure Maintenance, BR 1-400 on Shallcross Lake Road
Results
DE

Last Updated 11/05/2020 09:01 AM
Project Title

Oak Orchard Drainage Improvements Project - Phase 1

Physical Address View project details and contacts
City, State (County) Millsboro, DE 19966   (Sussex County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work under this project shall consist of construction at two sites in the Oak Orchard development referred to as Site 12 & 13 (Mercer Avenue) and Site 18 (Captain's Grant, alternate). Work proposed for Site 12&13 (Mercer Ave) consist of installation of new storm piping, drainage swales associated work as follows; approximately 565 LF of 15" RCP pipe; approximately 20LF of 18" RCP pipe; approximately 206 LF of 24" HDPE pipe (including 24" outfall into Indian River Bay); approximately 220 LF of 19"x30" elliptical RCP pipe. Work shall include installation of approximately 15 stormwater structures, approximately 600 LF of existing drainage channel reconstruction, and all necessary provisions to complete the scope of work, including but not limited to excavation and trench support, removal and disposal of existing drainage works, furnishing and installing drainage pipes and structures with appropriate appurtenances, backfilling, pipe support with pile, grading, topsoiling, seeding and stabilizing all disturbed areas. The project shall also include traffic management, erosion control measures, permanent pavement trench repair, pavement overlays and utility coordination to complete the project works. Work proposed for Site 18 (Captain's Grant, alternate) consist of installation of new storm piping, drainage swales associated work as follows: approximately 50 LF of HDPE 24" pipe; approximately 50 LF of 19"x30" elliptical RCP pipe. Work shall include approximately 1125 LF of existing drainage channel reconstruction, and all necessary provisions to complete the scope of work, including but not limited to excavation and trench support, removal and replacement of existing drainage works, furnishing and installing drainage pipes and structures with appropriate appurtenances, backfilling, pipe support with piles, grading, topsoiling, seeding and stabilizing all disturbed areas. The project shall also include traffic management, erosion control measures, permanent pavement trench repair and utility coordination to complete the project works.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents