Similar Projects
Kola Battery Energy Storage System
New Construction
Conception
$100,000,000 est. value
Tracy, CA 95377

Arcadia Power Substation Upgrade - Los Angeles County Metropolitan Transportation Authority (La Metro)
New Construction
Conception
$99,000,000 est. value
Los Angeles, CA 90012

The Cheval Blanc Beverly Hills / Hotel
LEED Certification, New Construction, Infrastructure - 211,971 SF
Design
$30,000,000 CJ est. value
Beverly Hills, CA 90210

Potrero Power Plant Site Redevelopment
Demolition, New Construction, Infrastructure, Renovation - 1,816,754 SF
Design
$2,000,000,000 CJ est. value
San Francisco, CA 94107

Traction Power Facilities Replacement - Walnut Creek
Renovation
Bidding
$29,818,451 CJ est. value
Oakland, CA 94612

Foothill Hydroelectric Power Plant Seismic Upgrade
Renovation
Bidding
$8,000,000 CJ est. value
Los Angeles, CA 90012

Military Ocean Terminal Concord (MOTCO) Wharf 2 Generator Site Work
New Construction
Post-Bid
$1,000,000 to $5,000,000 est. value
Concord, CA 94520

Grayson Repowering Project - Demolition and Site Improvement
Demolition, Infrastructure
Post-Bid
$100,000,000 CJ est. value
Glendale, CA 91201

Alameda Grant Line Solar I
New Construction
Pending Verification
$1,500,000 est. value
Tracy, CA 95391

Rodeo Renewed
Build-out
Pending Verification
$850,000,000 CJ est. value
Rodeo, CA 94572

K Line Traction Power Substation Enhancements - Los Angeles County Metropolitan Transportation Authority (La Metro)
Renovation
Conception
$99,000,000 est. value
Los Angeles, CA 90012

Glenarm Receiving Station Upgrades - 3266 - City of Pasadena
Infrastructure
Design
$4,730,000 CJ est. value
Pasadena, CA 91105

Proposed Grayson Repowering Project Unit 9 Separation
Renovation
Post-Bid
$3,500,000 to $4,500,000 est. value
Glendale, CA

Northview Complex
New Construction, Infrastructure - 22,200 SF
Pending Verification
$3,100,000 CJ est. value
Sacramento, CA 95833

Silver Peak Solar Project
New Construction
Conception
$114,000,000 est. value
Adelanto, CA

Last Updated 01/06/2023 07:15 AM
Project Title

Industrial Control System and IT Data Center Relocation at Plant No. 1 - P1-138 - Orange County Sanitation District

Physical Address View project details and contacts
City, State (County) Santa Ana, CA 92708   (Orange County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Power Plant
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2025
Bids Due View project details and contacts
Estimated Value $3,998,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will Relocate and reconfigure networking, fiber optics, and IT equipment from the Control Center and Power Building 3A to the new server room constructed by the P1-105 Headworks Rehabilitation Project. This Project will also provide adequate ventilation and air conditioning that will meet the needs of the new server room. The project is included in the Orange County Sanitation District 2023-2027 Capital Improvement Plan (CIP). As of January 6, 2023, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, High-Performance Structural Concrete, Concrete Finishing, Specialty Placed Concrete, Precast Structural Concrete, Precast Concrete Specialties.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Access Doors and Panels, Coiling Doors and Grilles, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Exterior Specialties, Security Mirrors and Domes.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Security Equipment.
Division 13 - Special Construction, Radiation Protection, Special Instrumentation, Seismic Instrumentation.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Personal Protection Systems, Electronic Detection and Alarm, Fire Detection and Alarm, Radiation Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Earthwork Methods, Soil Treatment, Soil Stabilization.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Fuel Distribution Utilities, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Utility Transformers, High-Voltage Switchgear and Protection Devices, Medium-Voltage Utility Switchgear and Protection Devices, Communications Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors, Cranes and Hoists.
Division 46 - Water and Wastewater Equipment.
Division 48 - Electrical Power Generation, Common Work Results for Electrical Power Generation, Instrumentation and Control for Electrical Power Generation, Electrical Power Generation Equipment, Electrical Power Generation Testing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents