Similar Projects
Jersey Mike's
Build-Out - 1,400 SF
Conception
Fort Worth, TX

Cousin's BBQ
Renovation - 5,000 SF
Conception
Fort Worth, TX

Whataburger #76
Renovation - 2,700 SF
Design
$400,000 est. value
Fort Worth, TX 76110

Hawaiian Bros.
Renovation - 4,000 SF
Design
Euless, TX

Black Bear Diner
Build-Out - 5,100 SF
Bidding
$600,000 est. value
Fort Worth, TX 76107

Buffalo Wild Wings
Renovation - 5,128 SF
Bidding
$1,300,000 est. value
Grapevine, TX

Target #T2243 - Beverage Bar Removal
Renovation, Demolition
Post-Bid
TX 75052

Chipotle Mexican Grill
Build-Out - 2,325 SF
Post-Bid
$400,000 est. value
Benbrook, TX 76126

Construction Manager-at-Risk, Two-Step Process
Renovation, Addition
Results
Azle, TX 76020

Kimball Park Development
New Construction
Construction
Southlake, TX 76092

Chick-fil-A
New Construction - 5,043 SF
Construction
$900,000 est. value
Colleyville, TX 76034

Goat & Vine Winery
New Construction
Conception
Fort Worth, TX

Black Rock Coffee
Renovation - 2,000 SF
Design
$300,000 est. value
Mansfield, TX

Dutch Bros Coffee
New Construction - 950 SF
Post-Bid
$400,000 est. value
Arlington, TX 76010

Elan Keller Center Stage
New Construction
Construction
Keller, TX 76248

Reported 06/27/2022 04:01 PM
Project Title

Conservatory at Keller Town Center Kitchen Remodel

Physical Address View project details and contacts
City, State (County) Keller, TX 76248   (Tarrant County)
Category(s) Commercial
Sub-Category(s) Food/Beverage Service
Contracting Method Bids by Invitation.
Project Status Construction Documents, Construction Start Expected August 2022, Construction Completion Expected December 2022
Bids Due View project details and contacts
Estimated Value $280,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remodeling of a restaurant in Keller, Texas. Working plans call for the remodel of a 2,950-square-foot restaurant. As of June 27, 2022, no applications have been submitted for building permits. An architect has been selected; however, a general contractor or selection method is not disclosed. Construction is tentatively expected to begin in August 2022 with completion in December 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Food/Beverage Service, 2,950 SF Renovation.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Thermal Insulation.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Painting.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Walk-In Freezers, Foodservice Shelving, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Bar Equipment, Service Line Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Commercial Dishwashers.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents