Similar Projects
Dollar General / Muskegon
New Construction, Infrastructure - 10,640 SF
Design
$3,000,000 CJ est. value
Muskegon, MI 49442

Taco John's / Roosevelt Park
Demolition, New Construction, Infrastructure - 1,957 SF
Design
$600,000 CJ est. value
Muskegon, MI 49441

RFQ Engineering - Lake Harbor Pathway Engineering Services
Infrastructure
Bidding
$400,000 CJ est. value
Norton Shores, MI 49441

RFQ Engineering - Lake Harbor Pathway Engineering Services
Infrastructure
Bidding
$400,000 CJ est. value
Norton Shores, MI 49441

Horton Park Improvements Phase II
Infrastructure
Post-Bid
$200,000 CJ est. value
Muskegon, MI 49445

Horton Park Improvements Phase II
Infrastructure
Post-Bid
$200,000 CJ est. value
Muskegon, MI 49445

H92036 Houston Avenue, Ninth to Third Street
Infrastructure
Results
$1,445,401 est. value
Muskegon, MI 49444

Hot Mix Asphalt Base Crushing, Shaping and Resurfacing, Aggregate Shoulders, Replace Culvert, Guardrail and Pavement Markings on Harrisburg Road
Infrastructure
Results
$1,068,000 est. value
Ravenna, MI 49451

802 Central Complex
New Construction - 60,088 SF
Construction
$15,400,000 est. value
Muskegon, MI 49445

Muskegon Museum of Art Expansion
Addition, Demolition, Renovation, Infrastructure
Construction
$11,200,000 CJ est. value
Muskegon, MI 49440

Adelaide Pointe Condos / Muskegon
New Construction, Infrastructure
Pending Verification
$250,000,000 CJ est. value
Muskegon, MI 49440

Adelaide Pointe Condos / Muskegon
New Construction, Infrastructure
Pending Verification
$250,000,000 CJ est. value
Muskegon, MI 49440

Ott /Story /Cordova Groundwater Treatment System Tank Coating and Equipment Replacement
Infrastructure
Bidding
$10,077,000 CJ est. value
Muskegon, MI 49445

Roaway Reconstruction of Leahy Street, Maffett Street and Reynolds Street Project
Infrastructure
Post-Bid
$400,000 CJ est. value
Muskegon Heights, MI 49444

Hot Mix Asphalt Pavement Reconstruction, Storm Sewer, Concrete Curb, Gutter, Sidewalk and Ramps, Signals and Pavement Markings on Terrace Street
Infrastructure
Results
$1,597,000 est. value
Muskegon, MI 49444

Last Updated 07/12/2023 08:40 AM
Project Title

Keating; Industrial to Port City

Physical Address View project details and contacts
City, State (County) Muskegon, MI 49442   (Muskegon County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $201,644 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

CONSTRUCTION INCLUDES .42 MILES OF HMA MILLING AND HMA PAVING IN THE CITY OF MUSKEGON, MUSKEGON COUNTY An amount equal to five percent (5%) of the Bid must be submitted with each Bid Proposal in one of three forms acceptable to the City of Muskegon. Attention is called to the fact that the City requires: the Contractor consider hiring local work force insofar as possible, not less than the salaries and wages set forth in the Specifications must be paid, 14% minority and 6.9% female are the goals established for participation in each trade, the Contractor must ensure employees and applicants for employment are not discriminated against based upon their race, creed, color, religion, sex, national origin, handicapped condition nor veteran background, and all pertinent regulations must be complied with. Bids may not be withdrawn within sixty (60) days after bid opening. The City of Muskegon reserves the right to reject any or all bids or to waive any informalities or irregularities in the bidding.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents