Similar Projects
Elevate Navarre
New Construction
Conception
Navarre, FL 32566

Stellar Golden Glades
New Construction, Demolition
Conception
$1,000,000 to $5,000,000 CJ est. value
Miami, FL

Fifth Avenue Estates
New Construction
Design
Homestead, FL 33034

Mandarin Parc
New Construction - 209,760 SF
Design
Homestead, FL 33032

Aquatics Facility Renovations - Deerfield Beach Middle School
Renovation, Infrastructure
Bidding
$1,425,000 est. value
Deerfield Beach, FL 33441

Routine and Emergency SVCS Pool of Prequalified Contractors
Infrastructure
Bidding
Miami Beach, FL

John Prince Memorial Park Phase 2 - Pool Area Renovation
Renovation
Post-Bid
Lake Worth, FL 33461

Morelisse Retreat
New Construction - 5,252 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Naples, FL 34120

Installation of Reinforced PVC Swimming Pool Membrane at Andrew R. Mickle Pool
Results
Gainesville, FL

Removal and Installation of Pool Lining
Results
Plantation, FL 33324

Polo Glen at Lake Betty
New Construction - 7,981,500 SF
Construction
Orlando, FL 32805

The Gatherings at Lake Nona
New Construction - 195,460 SF
Construction
Orlando, FL 32827

Westgate Village
New Construction
Pending Verification
Wesley Chapel, FL 28104

US Highway 27 Apartment Complex
New Construction
Pending Verification
Davenport, FL 33837

Redevelopment of Rainbow Village and Gwen Cherry 23C
New Construction
Conception
Miami, FL 33127

Last Updated 09/18/2021 03:40 AM
Project Title

Pool Repairs - Ann and Chuck Dever Regional Park Pool

Physical Address View project details and contacts
City, State (County) Englewood, FL 34224   (Charlotte County)
Category(s) Entertainment/Recreation
Sub-Category(s) Swimming Pool(s)
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall consist of, but is not limited to: Dechlorinate and drain the pool while properly controlling water table. Remove and replace expansion joint. Remove damaged tiles and legally dispose. Reset and re-grout new backsplash tile and depth markers in accordance with applicable Florida Code. Contractor is responsible for complete job site clean up after the project is complete. Contractor is responsible to refill and restart the pool. The existing backsplash tile is blue in color and approximately 4.5-inches. Replacement tiles will be provided by the County and are located on-site

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing.
Division 09 - Finishes, Special Coatings, Cementitious Coatings.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 26 - Electrical, Special Purpose Lighting, Underwater Lighting.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents