Last Updated 02/25/2020 12:49 PM
Project Title

Ledgewood Pond Dam Improvements

Physical Address View project details and contacts
City, State (County) Roxbury, NJ   (Morris County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes, but is not limited to lowering of lake in accordance with NJFW Water Lowering Permit; installation of temporary soil erosion and sediment control measures; construction of temporary cofferdam/piped stream diversion; clearing of trees from top of slope to toe of slope; resetting of monitoring wells, relocation of fishing line recycling bins, removing/resetting picnic tables, and removal of inactive poles/guy/lines; concrete repair work to existing outlet structure and coating repair of existing pipe; creation of 150' wide gabion basket auxiliary spillway; raising of berm east and west of auxiliary spillway and placement of trail surface treatment; construction of diaphragm drain around exposed piping; installation of 5' diameter manhole, concrete headwall with wingwalls and 36" RCCP, construction of concrete cradle and placement of gabions between wingwalls; grading, topsoiling, seeding and providing soil stabilization matting on exposed embankment slopes outside of spillway limits.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents