Similar Projects
Last Updated | 04/29/2023 01:34 AM |
Project Title | PA 869 - SR 2007 to Bedford Co Line |
Physical Address | View project details and contacts |
City, State (County) | Sidman, PA 15955 (Cambria County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Contract Award, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $2,714,250 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project is for the pavement preservation of approximately 6.522 miles of SR 0869 in Cambria County. Work includes milling and resurfacing, guiderail, drainage, tree trimming, signing and pavement markings, design and construction of concrete curb ramps and other miscellaneous construction as indicated on the approved drawings included in the bid package for STATE ROUTE 0869, SECTION 005, in CAMBRIA COUNTY, SUMMERHILL & ADAMS TOWNSHIPS at the locations indicated on the plans in the bid package. Project Cost Range: $2,500,000.00 - $4,999,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 0.00% Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: RESURFACING/OVERLAYS 408 Version: 2020-5 PennDOT - PA 869 - SR 2007 to Bedford Co Line *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |