Similar Projects
Tuscany Hills - Phase 7
New Construction
Design
Auburn, AL

Wyndham Gates
New Construction
Design
Opelika, AL 36804

Site Preparation - Mass Grading (Bid Package 1)
Results
Auburn, AL

Site Preparation - Tennis Courts (Bid Package 2)
Results
Auburn, AL 36849

Tiger Corners
New Construction - 12,245 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Auburn, AL 36830

Oak Bowery Pines
New Construction
Construction
Opelika, AL 36801

The Chimneys
New Construction
Pending Verification
Opelika, AL 36801

Weber Farms South Extension 2
New Construction
Pending Verification
Auburn, AL 36849

The Lakes At Anderson Road - Phase 3
New Construction
Design
Opelika, AL

Roanoke Reconstruction of Burn Unit
Renovation
Results
$46,742 est. value
Auburn, AL

Camden South
New Construction - 2,350 SF
Construction
Auburn, AL 36849

Waverly And Veterans Subdivision
New Construction
Pending Verification
Opelika, AL 36801

Hidden Lakes West
New Construction
Design
Opelika, AL

East Park Reconstruction of Burn Unit
Renovation - 1,609 SF
Results
Auburn, AL 36830

Tuscany Hills
New Construction
Construction
Auburn, AL

Last Updated 12/17/2021 02:47 PM
Project Title

Cannon Gate

Physical Address View project details and contacts
City, State (County) Opelika, AL 36801   (Lee County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method
Project Status Construction Commenced April 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Single-Family Homes, 1,300 to 4,300 SF New Construction, 85 Unit(s).
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents